Approved Plan - Landscape Specification prepared by URBIS - OPW24/0110
• Top up gravel mulch as required
• Mulched surfaces are to be kept clean and tidy and free of any deleterious material
and foreign matter
• Check plants weekly of pest and disease infestation
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply a balance of man-made and natural slow release fertiliser to all planting
areas in a 3-month interval.
• Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
adapt fertiliser regime to suit. Treat as required
• Aerate at 12-month intervals
Trellis System • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Bind up climbing plants
• Replace failed plans immediately
• Weed regularly (weekly)
• Check plants weekly of pest and disease infestation
• Spray for pests and disease infestations when the pest and fungal attack has been
identified
• Apply fertilizer as per manufactures manual
• Check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and
adapt fertiliser regime to suit. Treat as required
Irrigation • Adjust irrigation control as required by the respective season
• Check irrigation system of possible leaks and sound operation of automatic system
monthly
• Flush irrigation system at 12-month intervals.
• Maintain irrigation component as required by the manufacturers manual
External furniture and • Maintained in accordance to manufacturer’s instructions
structure • Apply sealer in accordance to manufacturer’s instructions
Timber Works • Inspect monthly
• Removal of splinters, the replacement of cracked, cupped or degraded boards as
identified at inspection
• Apply a light sand and preservative coat in accordance with manufacturers
specification at 6-month intervals
• Retightening and/or replacement of fixings at 12-month intervals
Artificial Timber Works • Inspect monthly
• Sweep deck and clean gaps between the boards regularly
• Clean deck in the intervals and with a cleaning product recommended by the
manufacturer
• Do not use high pressure cleaners
• Treat scuffs and scratches as per manufacturers recommendation
Tree / Palm Transplanting • Monitoring / adjusting the irrigation system or watering regime in liaison with the
Landscape Contractor, water if required
• Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
URBIS
URB-P0003847-000-SP.DOCX PAGE 56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.