Original source · versioned page text
2 David Low Way - Town Planning Report - Urban Systems Pty Ltd
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
Original PDF page 60, section 1. The text section number identifies this passage in the reader.
Table 16—Specific outcomes and probable solutions for the Eastern Beaches locality Specific outcome Probable solution Applicant response b) changes to natural coastal processes; c) disturbance of the dune system and wetland system; d) management of landslide and fire risk; e) erosion and the transport of sediments off site; f) unmanaged public access; g) effluent disposal64; h) changes to fauna habitat and behaviour; and i) disturbance of buildings and features, including natural features of cultural heritage significance. Open space network S15.1 Open space corridors and Not applicable. O15 An integrated open space existing native vegetation in areas The proposed development does network is established, enhanced indicated in Schedule 5 – Map 3 not involve an open space and protected throughout the are protected from fragmentation corridor. locality to— and encroachment by a) provide for both passive and development. active recreational pursuits; b) provide connectivity for pedestrians and cyclists, c) provide habitat connectivity for wildlife; d) protect watercourses and drainage lines; e) protect vegetation on steep slopes; and a) form a scenic backdrop for residential development. Pedestrian and bicycle pathways S16.1 Pedestrian and bicycle Complies with probable solution. O16 Safe and convenient pathways are provided and The existing bikeway is retained. pedestrian and bicycle pathways retained where indicated in the are provided and retained between Priority Infrastructure Plan in Part and throughout key destinations 15; including— AND a) an east-west link between the S16.2 Contributions toward beach and the northern end of pedestrian and bicycle pathways Lake Weyba via Burgess Creek; are provided in accordance with b) a north-south link between the the Priority Infrastructure Plan in Noosa National Park to the north of Part 15. the locality and the former Shire boundary near Peregian Beach; and c) links within and around Sunrise and Sunshine Beach linking business and community uses with residential development. Beach access points Complies with specific outcome. ROL, 2 David Low Way Page 36 August, 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.