Original source · versioned page text
2 David Low Way - Town Planning Report - Urban Systems Pty Ltd
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
Original PDF page 72, section 1. The text section number identifies this passage in the reader.
Table 18—Specific outcomes and probable solutions for the reconfiguring a lot code
Specific outcome Probable solution Applicant response
d) rock outcrops; and
e) views.
O22 Native vegetation, including S22.1 Buffers of existing native Complies with probable solution.
individual mature trees are vegetation around site boundaries A ten (10) metre wide landscape
retained, protected, maintained and environmentally sensitive buffer is provided along David
and supplemented, with particular areas are retained and reinforced Low Way.
consideration given to— through additional planting; Covenant areas for vegetation
a) roadsides; AND protection are to be protected and
b) the amenity of adjoining land S22.2 For reconfiguring in the rehabilitated.
uses; and Rural Zone and Rural Settlement
c) the protection of environmentally Zone—
sensitive areas. a) a 10m landscaped buffer area is
provided along road frontages;
b) clearing and disturbance to
vegetation is minimised around
road works, laying of services and
utilities and construction of
property entrances;
c) revegetation of disturbed areas
occurs after completion of works;
and
d) planting of clusters of trees
along the road
reserves to form a tree canopy
cover is provided
O23 Buildings and other structures S23.1 All lots include a building Complies with probable solution.
do not have a significant adverse envelope that enables buildings Each building pad is not visually
impact upon the visual amenity of and structures to be sited so they obtrusive.
surrounding areas. do not—
a) protrude above ridgelines; or
b) result in the unnecessary
removal of vegetation from the site.
14.192 Open space and environmental protection
O24 Public open space provides S24.1 Active Parkland or open Complies with probable solution.
for a diverse range of passive and space linkage to Active Parkland is Contributions may be paid in
active quality recreational provided in accordance with the accordance with the endorsed
opportunities including sport to Priority Infrastructure Plan in Part infrastructure charges framework.
meet the outdoor recreational 15;
needs of the community. OR
S24.2 Park contributions are paid
in accordance with the applicable
infrastructure charging instrument.
O25 Public open space is designed S25.1 A park has direct road Not applicable.
and located to— frontages of a minimum of 25% of The proposed development does
a) be safe and easily accessible; the total allotment boundary of the not involve the dedication of
b) contribute to the legibility, park to provide physical access parkland.
accessibility and character of the and visibility;
locality; AND
c) create attractive environment S25.2 Land intended for public
settings and focal points; open space complements existing
adjacent and surrounding open
ROL, 2 David Low Way Page 48 August, 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.