RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2)

of 90

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 22, section 1. The text section number identifies this passage in the reader.

4.4    WBNM Analysis Pre-Development Scenario


A WBNM was approximated for the existing catchments according to existing site parameters.
The model estimated that the existing 1% AEP peak flow discharge from the site was
0.8m3/s overall. Pre-development peak flow rates for all design storms are provided in Table
4-4.


                                         EXISTING CASE - COMBINED
                                                Peak Flow Rates - Q (m3/s)
                          AEP             WBNM             RM           Difference
                         63.2%            0.197           0.209             6.1%
                          50%             0.242           0.277            14.5%
                          20%             0.457           0.384           -16.0%
                          10%             0.485           0.465            -4.1%
                          5%              0.578           0.552            -4.5%
                          2%              0.725           0.704            -2.9%
                          1%              0.801           0.807             0.7%
                         Table 4-4 WBNM discharge flow rates for pre-development catchments




The Rational Method was used to provide an estimate of a range of flows for the total pre-
development catchment for comparison and verification of the WBNM model. See Appendix
D for calculations. The Rational Method results are within 20% of the results obtained from
the WBNM analysis for the pre-development case across all storm events. From the
comparison of results, it is determined that the Rational Method verification corresponds well
with the WBNM analysis results.




2576-SBSMP-01_Version 2.0 (April 2026)                                                        Page 17 of 23
SX/TB

Log in to download the original (RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.