4.5 WBNM Analysis Post-Development, Unmitigated Scenario
Peak flow rates, for the post-development scenario without any intervention measures, were
generated by WBNM to provide a comparison to the pre-development runoff. The table below
shows peak discharge in all storm events for the unmitigated post-development scenario,
including a difference comparison to the pre-development scenario.
DEVELOPED CASE - LPOD1
Peak Flow Rates - Q (m3/s)
AEP EXISTING DEVELOPED Difference
63.2% 0.197 0.493 150.3%
50% 0.242 0.556 129.8%
20% 0.457 0.748 63.7%
10% 0.485 0.905 86.6%
5% 0.578 1.072 85.5%
2% 0.725 1.212 67.2%
1% 0.801 1.347 68.2%
Table 4-5 WBNM discharge flow rates at LPOD1 for the unmitigated post-development scenario
DEVELOPED CASE - LPOD2
Peak Flow Rates - Q (m3/s)
AEP EXISTING DEVELOPED Difference
63.2% 0.000 0.012 N/A
50% 0.000 0.013 N/A
20% 0.000 0.018 N/A
10% 0.000 0.024 N/A
5% 0.000 0.025 N/A
2% 0.000 0.026 N/A
1% 0.000 0.029 N/A
Table 4-6 WBNM discharge flow rates at LPOD2 for the unmitigated post-development scenario
DEVELOPED CASE - COMBINED
Peak Flow Rates - Q (m3/s)
AEP EXISTING DEVELOPED Difference
63.2% 0.197 0.504 155.8%
50% 0.242 0.569 135.1%
20% 0.457 0.766 67.6%
10% 0.485 0.929 91.5%
5% 0.578 1.097 89.8%
2% 0.725 1.239 70.9%
1% 0.801 1.376 71.8%
Table 4-7 WBNM discharge flow rates from the site for the unmitigated post-development scenario
2576-SBSMP-01_Version 2.0 (April 2026) Page 18 of 23
SX/TB