Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment E - 8.2.1 Acid Sulfate Soils Overlay Code · MCU20/0071

of 3

Text shows just the words. Original shows the document exactly as it was published.

8.2.1               Acid Sulfate Soils Overlay Code

8.2.1.1             Application
(1)     This code applies to assessable development:
        (a)    subject to the Acid Sulfate Soils Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
        (b)    identified as requiring assessment against the Acid Sulfate Soils overlay code by the tables of assessment in Part 5
               (Tables of assessment).

(2)     All provisions in this code are assessment benchmarks for applicable assessable development.

Editor's Note—the Acid Sulfate Soils Overlay Maps in Schedule 2 (Mapping) identify the following areas potentially subject to acid sulfate
soils:-
(a)     Area 1 (Above 5 metres to 20 metres AHD); and
(b)     Area 2 (5 metres AHD or below).

Editor’s Note—Planning scheme policy for Assessment of Natural Hazards provides advice and guidance for achieving certain
outcomes of this code, including guidance for the preparation of an ASS investigation report and management plan.

8.2.1.2             Purpose and overall outcome
(1)     The purpose of the Acid Sulfate Soils overlay code is to ensure that the generation or release of acid and metal contaminants from
        acid sulfate soils (ASS) does not have adverse effects on the natural environment, built environment, infrastructure or human
        health.
(2)     The overall outcome of the Acid Sulfate Soils overlay code is that development ensures that the release of acid and associated
        metal contaminants into the environment is avoided by either:

         (a)   not disturbing ASS when excavating or otherwise removing soil or sediment, extracting groundwater or filling land; or
         (b)   treating and, if required, undertaking ongoing management of any disturbed ASS and drainage waters.




                                                   NOOSA PLAN 2020                                                                     Page 1 of 2
Full text of the other 2 pages

Page 2

Table 8.2.1.3 - Criteria for assessable development
Performance outcomes                    Acceptable outcomes                           Compliance

Avoidance and management of ASS
PO1                                     AO1.1                                         As detailed in the accompanying civil
Development:                            The disturbance of ASS is avoided by:         engineering drawings, the proposed
                                                                                      development demonstrates compliance with
(a)   does not disturb ASS; or          (a)   undertaking an ASS                      the requirements of AO1.1 as the extent of
      is managed to avoid or minimise         investigation and soil analysis         earthworks required does not include
(b)
                                              according to the National Acid          significant cut across the site. This will be
      the release of acid and metal
                                              Sulfate Soils Guidance;                 subject to detailed review at the OPW stage.
      contaminants, where disturbance
      of ASS is unavoidable.            (b)   not excavating or otherwise
                                              removing soil or sediment
                                              containing ASS;
                                        (c)   not permanently or temporarily
                                              extracting groundwater that results
                                              in the aeration of previously
                                              saturated ASS; and
                                        (d)   not undertaking filling on land at
                                              or below 5 metres AHD that
                                              results in:-
                                              (i)    actual ASS being moved below
                                                     the water table; or
                                              (ii)   previously saturated ASS being
                                                     aerated.


                                        Editor's note—National Sampling and
                                        Identification Methods Guidelines is a
                                        reference to:
                                        (a)   National Acid Sulfate Soils Guidance:
                                              National acid sulfate soils sampling
                                              and identification methods manual,
                                              Department of Agriculture and Water
                                              Resources, Canberra (Sullivan et al,
                                              2018); and
                                        (b)   National Acid Sulfate Soils Guidance:
                                              National Acid Sulfate




                                          NOOSA PLAN 2020                                                                  Page 2 of 2

Page 3

Performance outcomes   Acceptable outcomes                             Compliance

                       (a)    National Acid Sulfate Soils Guidance:
                              National Acid Sulfate Soils
                              Identification and Laboratory Methods
                              Manual, Department of Agriculture and
                              Water Resources, Canberra; and
                       (b)    the Australian Standard 4969.

                        AO1.2
                        The disturbance of ASS avoids the release
                        of acid and metal contaminants by:
                       (a)    undertaking an ASS investigation
                              conforming to the National Acid
                              Sulfate Soils Guidance;
                       (b)    neutralising existing acidity and
                              preventing the generation of acid and
                              metal contaminants using strategies
                              documented in the Soil Management
                              Guidelines; and
                       (c)    preventing the release of surface or
                              groundwater flows containing acid and
                              metal contaminants into the
                              environment.

                        AND

                        Editor's note—Soil Management
                        Guidelines is a reference to the
                        'Soil Management Guidelines. Queensland
                        Acid Sulfate Soils Technical Manual'. Dear
                        SE, Moore NG, Dobos SK, Watling KM and
                        Ahern CR. Department of Natural
                        Resources and Mines (2002).

                        AO1.3
                        Where potential or actual ASS is identified,
                        they are managed in accordance with an
                        ASS management plan.




                         NOOSA PLAN 2020                                            Page 3 of 2

Used in these records

About this file

File size
92 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment E - 8.2.1 Acid Sulfate Soils Overlay Code.pdf · 92 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.