Council archive · source document
Attachment E - 8.2.1 Acid Sulfate Soils Overlay Code · MCU20/0071
Table 8.2.1.3 - Criteria for assessable development
Performance outcomes Acceptable outcomes Compliance
Avoidance and management of ASS
PO1 AO1.1 As detailed in the accompanying civil
Development: The disturbance of ASS is avoided by: engineering drawings, the proposed
development demonstrates compliance with
(a) does not disturb ASS; or (a) undertaking an ASS the requirements of AO1.1 as the extent of
is managed to avoid or minimise investigation and soil analysis earthworks required does not include
(b)
according to the National Acid significant cut across the site. This will be
the release of acid and metal
Sulfate Soils Guidance; subject to detailed review at the OPW stage.
contaminants, where disturbance
of ASS is unavoidable. (b) not excavating or otherwise
removing soil or sediment
containing ASS;
(c) not permanently or temporarily
extracting groundwater that results
in the aeration of previously
saturated ASS; and
(d) not undertaking filling on land at
or below 5 metres AHD that
results in:-
(i) actual ASS being moved below
the water table; or
(ii) previously saturated ASS being
aerated.
Editor's note—National Sampling and
Identification Methods Guidelines is a
reference to:
(a) National Acid Sulfate Soils Guidance:
National acid sulfate soils sampling
and identification methods manual,
Department of Agriculture and Water
Resources, Canberra (Sullivan et al,
2018); and
(b) National Acid Sulfate Soils Guidance:
National Acid Sulfate
NOOSA PLAN 2020 Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment E - 8.2.1 Acid Sulfate Soils Overlay Code.pdfRelated documentApplication case desk ↗
About this file
- File size
- 92 KB (small file)
- File type
No other editions are linked here.