Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                           POST DEVELOPMENT INTERNAL CATCHMENT B TO BE TREATED
                                             IN BIO-RETENTION A=0.529Ha. AREA ALSO TO BE TREATED IN
                                           DETENTION. AS THESE AREA DO NOT FLOW TO BASIN PART OF                                              POST DEVELOPMENT INTERNAL
                                                     EXTERNAL CATCHMENT WILL BE TREATED INSTEAD.                                              CATCHMENT A TO EAGLE DRIVE
                                                                                                                                              EXTENSION A=1.056Ha
                                                         EXISTING HOUSE WITH
                                                    ROOFWATER TO TAIT STREET,                                                                                                             EXTERNAL CATCHMENT C TO EAGLE
                                                     UNCHANGED AND NOT PART                                                                                                               DRIVE EXTENSION. IF DEVELOPED
                                                          OF TREATMENT AREA                                                                                                               OTHERS TO TREAT WATER QUALITY
                                                                                                                                                                                          AND DETENTION.




                                             NEW ROOFWATER ONLY PIPE
                                            TO TAIT STREET STORMWATER
                                            SYSTEM (NO OVERLAND FLOW)




                                                                                                                                                                                                   S
                                                                                                                                                                                                   SW




                                                                                                                                                                                  +        +




                                          OVERALL
                                          DEVELOPED
                                          EXTERNAL
                                          CATCHMENT                                                                                                                           CERTIFIED BY:
                                          F TO 14
                                          EAGLE                                                                                                                               RPEQ No.:         13201 (Allister Haynes)
                                          DRIVE AS                                                                                                                            DATE:             19/6/2017
                                          PER
                                          COUNCIL
                                          MASTER
                                          DRAINAGE
                                          CATCHMENTS.

E
D
                                                    PSM No    -
                                                                                                      HAYNES CONSULTING ENGINEERS       EAGLE DRIVE - TEWANTIN
C
                                                   (AHD) RL   -
                                                                                                             ABN 53 613 630 078         RECONFIGURATION INFORMATION RESPONSE                                1702
B 27-6-17   REVISED REAR BDY LOTS 14/15   ATH     SURVEYED    -
                                                                                                      PO BOX 549 NOOSA HEADS QLD 4567   PROPOSED SUBDIVISION 20 EAGLE DRIVE                                 Sheet No. - Revision No.
A 11-6-17   FOR APPROVAL                  ATH
Rv DATE               REVISIONS           APPR.
                                                                                                               (0432) 784 150
                                                                                                                                        STORMWATER LAYOUT PLAN                                              01                  B
Log in to download the original file

Appendix C - Engineering Plans.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.