Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published) · MCU25/0022

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
                      Storage of Chemical and Hazardous Substances
               7.     Any storage of flammable and/or combustible liquids must comply with the minor storage
                      provisions of Australian Standard AS1940 “The Storage and Handling of Flammable and
                      Combustible Liquids”.
               8.     The storage of chemicals must be within a secure and designated storage area that is safe,
                      well-ventilated, and free from potential ignition sources. The storage of hazardous chemical
                      must comply with the Work Health and Safety Regulation 2011, which outlines specific
                      requirements for safe storage and handling of hazardous chemicals.
                      Bushfire Management
               9.     An accessible dam, swimming pool or water tank (in addition to day-to-day water supply)
                      with an onsite water volume of not less than 5,000 litres must be available for firefighting
                      purposes, located within reasonable proximity to building.
               10.    A water supply outlet pipe 50 millimetres in diameter and fitted with a standard fire brigade
                      fitting must be connected to the water supply (other than where the water supply is in a
                      swimming pool or dam).
               ENGINEERING
                      Site Access and Driveways
               11.    An access driveway must be provided from the existing formation in Sankeys Road to all
                      parking and manoeuvring areas of the development. The works must be undertaken
                      generally in accordance with the approved plans.
                      Stormwater Drainage
               12.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Easements
               13.    Unless otherwise agreed in writing by the relevant service provider, any public or third-party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               14.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               15.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               16.    All development works must be carried out in accordance with the recommendations
                      contained in the Slope Stability Assessment prepared by Civil Quality Assurance Pty Ltd
                      dated 17 July 2023.




                                                                                                     Page 14 of 21

Document Set ID: 24249087
Version: 16, Version Date: 24/07/2026

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published).pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.