Council archive · source document
Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published) · MCU25/0022
Earthworks and Retaining Walls
17. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments.
18. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
19. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
20. Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW25/0029)
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
2022026 07 of 09 A Access Driveway Working Plan prepared by 18/02/2025
Indecom Solutions
2022026 08 of 09 A Access Driveway Cross Sections Sheet 1 of 18/02/2025
2 prepared by Indecom Solutions
2022026 09 of 09 A Access Driveway Cross Sections Sheet 2 of 18/02/2025
2 prepared by Indecom Solutions
2. The Currency Period for this development approval lapses if the development has not
substantially started by 19 January 2028, unless an application to extend the currency period
is approved by Council.
3. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice.
b. The relevant conditions of the higher order Material Change of Use approval ref.
MCU24/0123 to which this approval relates.
c. All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
SITE SPECIFIC CONDITIONS
Bonds
4. A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
Page 15 of 21
Document Set ID: 24249087
Version: 16, Version Date: 24/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published).pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.