Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

SUPERSEDED Decision Notice - 010.2007.00001022.001 [As Published] · 132007.1022

of 12

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                4 of 12

9.    All side and rear boundary fencing shall not exceed 2.0m above Natural Ground Level or 1.8m above
      Finished Ground Level whichever is the higher.

10.   Existing trees on the site and within road reserves are to be retained, except where required to be
      removed due to building operations or the conduct of the approved use. These landscape plans required
      to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be
      retained.

11.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
      as open structures.

12.   All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).

13.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
      Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
      and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
      comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
      exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
      requirement.

14.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted,
      to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
      operational works. The cash bond or trading bank guarantee will be returned on performance of the
      conditions of approval less any costs incurred by Council in respect of enforcing performance of this
      permit.

15.   The requirements of this development approval are to be effected, prior to the use of the premises.
      Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
      compliance with conditions.

16.   The Development Permit for a material change of use of premises lapses if the use has not happened by
      22 August 2011, unless an application to extend the currency is approved by Council.
Building Services

Demolition
17.   Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
      damage and made safe to the standard required by the regulatory authority;

18.   All infrastructure must be disconnected, capped or sealed including:-
             electricity meters removed and electrical wires disconnected; and

             telephone lines are disconnected; and

             high speed data cables and television provider boxes are disconnected and removed to the
             standard required by the regulatory authority;
19.   All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
      must be removed from the building and disposed of in accordance with industry best practice.

20.   Waste generated during construction must be stockpiled in a centralised location and covered as required
      to prevent material being blown onto adjoining properties including the road reserve or food waste from
      generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
      or via an approved waste receptacle and collection service. Storage areas are to be located near the
      temporary access to the site so that access can be gained with out damage to infrastructure.

21.   All building materials containing asbestos products must be disposed on in accordance with industry best
      practice.

22.   The transportation of all materials to and from the site must be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
      shall be covered to prevent materials including dust being windblown from the vehicle.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@10061a81\@[email protected]

Used in these records

About this file

File size
57 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00001022.001 [As Published].pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.