NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 12
Service Easements (Sewer)
45. A registered easement shall be created over the zone of influence of all sewers within the subject site and
over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
accurately locate all sewer mains and determine the necessary width of the easement, which shall be
shown on any plans submitted for Operational Works and Building Works approval. To this extent the
surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
be created.
46. No building or other structure shall be constructed or encroach over an easement.
Earthworks
47. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural stormwater runoff. Detailed site surveys indicating
natural surface levels and contours of the adjoining properties must be provided with the application for a
Development Permit for Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path within the
development site that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the
drainage pipes or overland flow-path will also be required. In this regard a Development Permit for
Operational Works shall be obtained.
Should evidence prepared and certified by qualified engineer or surveyor be provided to Council indicating
that no additional ponding of stormwater will occur on the adjoining properties the requirement for the
drainage pipes, overland flow-path and easement shall not apply.
48. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
structures that border the development site.
Acid Sulfate Soils
3
49. As the site is located below the 5m AHD, any excavation works consisting of 100m or greater and/or any
3
filling works consisting of 500m or greater and with an average depth of 0.5m or greater will need to be
carried out in accordance with State Planning Policy 2/02 Planning and Managing Development Involving
Acid Sulfate Soils. In this regard appropriate testing and supporting documentation prepared by a suitably
qualified specialist shall be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works.
Erosion and Sediment Control
50. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
51. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $2,974
PSP16 – Sewerage Headworks Contributions $2,576
PSP17 – Water Supply Headworks Contributions $3,027
PSP20 – Pathway Trunk Network Contributions $669
TOTAL Contribution Amount = $9,246
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from June 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@10061a81\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2007.00001022.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.