INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)
IDAS Assessment Checklist, Version 15.0, 18 November 2005
CJ (i) development on land not contiguous to a State-controlled road and -
LJ (a) material change of use - ‘
* assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. that schedule;
( (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
¢ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
KX (iii) none of the above
Clearing vegetation
For more information refer to Guide 12,
Untess you answered ‘none of the above" to Q3, the
pplication requires assessment by the Department
of Natural Resources and Mines (NR&M).
If an agency other than NR&M is the assessment
manager for the application, NR&M is a concurrence
+ agency for the application in relation to this matter.
The application involves: (tick applicable boxes)
OO (i) material change of use ~
(a) assessable against the planning scheme;
(b) on a lot containing - ,
« acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
{d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
C1 (i) reconfiguring a lot -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) -where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Di) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
KI (iv) none of the above.
Strategic port land
For more information refer to Guide 11,
{fF you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
ifyou ticked {ii) Queensland Transport is a
coneurrence agency for the application.
The application involves:
(1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
Ci (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1 ”
(iii) none of the above
Acid sulfate soils
For more information refer to, Guide 10,
Unless you answered “none of the above” to Q5, the
application requires assessment by Department of
Natural Resources and Mines (NR&M).
If an agency other than NR&M is the assessment
manager for the application, NR&M Is an advice
agency for the application in retation to this matter.
The application involves development on land situated in an identifiedS local government area
and where the surface of the land is: (tick applicable box)
(1 (i) below 20m AHD® and the development will involve the excavation of 1000m3or more:of
soil or sediment at or below 5m AHD, or
C1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
(iti) none of the above
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum (AHO).
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1304 - Operational Works for 74 Peregian Esplanade, Peregian Beach [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.