INTEGRATED PLANNING ACT 1997
Major hazard facilities or possible
major hazard facilities
For more information refer to Guide 17.
Ifyou answered "YES" to 06, the application
requires assessment by the Department of
Ememency Services (DES).
If am agency other than DES is the assessment
manager for the application, DES Is a concurrence
agency for the application in relation to this matter.
IDAS Assessment Checklist, Version 15.0, 18 November 2005
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
NO
(DYES - complete Part L of Form 1
Water related development under the
Water Act 2000
For more information about items (a} - (d), refer to
Guide 15. For more information about item {e),
Tefer to Guide 14 Does my application involve
assessment of a referable dam?
Untess you answered ‘none of the above" to Q7, the
application requires assessment by the Department
of Natural Resources and Mines (NR&M).
If an agency other than NR&M is the assessment
manager for the application, NR&M is a concurrence
agency for the application In relation to this matter.
The application involves:
C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
Ota)
Di (b)
O(c)
Di)
Oe)
On
in a watercourse, fake or spring, or from a dam constructed on a watercourse (eg.
@ pump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, Ks, Ks, Ke, or Ko of
Form 1 whichever is applicable;
for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;
for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K: of Form 1;
for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K; of Form 1,
for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; or
for taking or interfering with overland flow water - complete Parts Ke and G of Form 1
1 (ii) none of the above.
Removal of quarry material froma
watercourse
For more information refer to Guide 16.
If you answered "YES" to Q8, the application
requires assessment by the Department of Natural
Resources and Mines (NR&M).
If an agency other than NR&M is the assessment
manager for the application, NR&M is a concurrence
agency for the application in relation to this matter.
Note: Part G of Form 1 is required to be completed
as the activity of removing quany material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Wafer Act 2000?
INO
(DYES - complete Parts K; and G of Form 1
Operational works in a tidal area or
coastal management district
For more information refer to Guide 18. For more
information about prescribed tidal work in local
government tidal areas refer to Guide 24,
Unless you answered “none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA Is the assessment
Manager for the application, EPA is a concurrence
agency for the application in relation to this matter.
Local government is the assessment manager for afl
prescribed tidal work.
The application involves operational work that is: ( tick the applicable boxes)
E (i) _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; of
tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; oF
carried out within a coastal management district under the Coastal Act and for — complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.
Diti
0 i)
Ol)
[7] (b)
Dt)
CI (a)
Ole)
Ot
Og
Oth)
Of
constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Wafer Act 2000 ;
constructing a canal’? intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
1 (iv) none of the above.
7 The declared ground water areas are listed in Guide 13 Development in ¢ declared catchment area.
8 Referable dam is defined under the Water Act 2000.
3 Watercourse is defined in sch 10 of the IPA.
10 Tidal work is defined in sch 10 of the [PA.
411 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastaf Protection and Management Act 1995
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1304 - Operational Works for 74 Peregian Esplanade, Peregian Beach [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.