areas
For more information refer to Guide 18.

Unless you answered ‘NO” to 14, the refevant Port
Authority is the assessment manager for the
application and the Enviconmentat Protection
Agency (EPA) and Queensland Transport (QT} are
concurrence agencies for the application.

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es}
mark i) ti AS nder the Co: ie
For more information refer to Guide 18, For more OD (i) tidal work's as defined undei | 1 astal Protection and Management Act 1995 (the
information about prescribed tidat work in locat Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; OF
goverment tal areas refer to Guide 24 LD (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
Untess you answered ‘none of the above” to Q10, ee . a pet
the application triggers referral to Queensland O iii) carried out within a coastal management district'S under the Coastal Act and for -
‘Transport (QT) (Maritime Safety Qid) as a on : . eg
aero agency. me 8 (a) _ disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager fot all MofFom 1;
preseribed fda work. (Db) reclaiming tand under tidal water - complete Part M of Form 1; or
(J (c) constructing a canal", if the canal is associated with reconfiguring a lot - compiete
Part M of Form 1;
EX (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information rite on [J (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to Q11, ‘i, i ictrinti5
the spptation requires assessment bythe work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). (i) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment } i istrit is —
rar the coptccion EPA is a concurence work, carried out completely or partly in a coastal management district that is
agency for the application in relation to this matter. « the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
(ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 (iv) reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'S — complete Part M of Form 1
J (v) none of the above
Development within the limits of a 12. Does the application involve development below high water mark'? and within the limits of a port
port under the Transport infrastructure Act 1994?
For more information refer to Guide 18. For &® NO
information about prescribed tidal work refer to
Guide 24, (7 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
ifyou answered “YES” to Q12, the application
‘tiggers raferral to the Port Authority.
The Port Authority is a concurrence agency if the
development Is -
@ within 200m of a shipping channel or an entry
and exit shipping corridor for the port
«@ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned part facility identified
in a land use plan approved under the Transport
Infrastructure Act 1994.
{n all other situation the Port Authority is an advice
agency.
Marinas 13, Does the application involve operational work that is tidal work for a marina? with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
fdal work refer to Guide 24, The local government XI NO
§ the assessment manager fr all prescribed ida (CIES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
(fyou answered “YES* to Q13, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal| 14, Does the application involve tidal works within a strategic port land tidal area2"?

No
[YES - compiete Part M of Form 1

 

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and inciudes certain tidal works completely or partly within a focal government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastat management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.

16 Canai means canal as defined under the Coasta! Protection and Management Act 1995

17 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

18 Under s117 of the Coastal Profection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an arlificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.

20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.

Page 4

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1304 - Operational Works for 74 Peregian Esplanade, Peregian Beach [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.