Attached to the e-mail Response to Information Request (Planning Response & Architectural Plan Series Part 1)MCU18/0015 & RAL18/0001.
of approval requiring more detailed technical assessments to be undertaken to prove up this
construction methodology.
Item 9 – Provide an alternative to the rapid infiltration pits.
Response – Rapid infiltration pits have been removed from the engineering design. The
Engineering Report included at Attachment 4 provides a detailed assessment of stormwater
quantity measures and it has been determined that due to the site being located at the lower end
of a large external catchment, on site stormwater detention is not required as the proposed
development will not cause an actionable nuisance for downstream properties. Please refer to
Section 7.2 of the Engineering Report for the full assessment.
Item 10 – Provide full details as to how excavations on the site for the currently proposed
development layout are to be constructed and the retention systems to be employed to avoid
causing instability both during and post construction.
Response – Section 6.1 and 6.2 of the Geotechnical Report included at Attachment 5 outline the
proposed measures for ensuring slope stability is maintained during construction.
Item 11 – Provide an assessment of the potential for long-term erosion to occur in the creek and
the effect this will have on the stability of the adjacent land.
Item 12 – Recommendations should be provided, if required, on measures to reduce the potential
for erosion.
Response – Rainwater tanks are proposed to be provided on the 2 dwelling house lots and a SPEL
tank is proposed on the unit allotment which will capture frequent minor storm events. All
stormwater outlets to the existing flow path are proposed to be provided with appropriate scour
protection measures and flow dissipation devices. The geotechnical report additionally
recommends a variety of measures to ensure slope stability around the creek including
revegetation and creek bank stabilisation measures such as the use of matting, geo cell products
and the like to ensure slope stability is maintained in the long term. The applicant would expect
that conditioning of the recommendations in the geotechnical report would form part of any
development approval and that specific measures to control erosion would be addressed as part
of the detailed design of the development.
P: 07 5452 5207
E: [email protected]
45 First Ave, Mooloolaba Qld 4557
PO Box 1043 Maroochydore Q 4558
Page 5 of 19 townplanningsunshinecoast.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Response letter to Council Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 649 KB (small file)
- File type
No other editions are linked here.