Council archive · source document
Planning Response letter to Council Information Request · MCU18/0015
Attached to the e-mail Response to Information Request (Planning Response & Architectural Plan Series Part 1)MCU18/0015 & RAL18/0001.
Item 13 – Provide an independent slope stability assessment and geotechnical report for each of
the proposed allotments. The report should clearly identify any potential slope stability failure
mechanisms that apply to each of the allotments. If appropriate, recommendations on measures
to stabilise the land or maintain stability should be included. The report should clearly set out the
site specific geotechnical constraints to residential development that apply to each of the
allotments. Recommendations should be provided on footing design and the geotechnical design
aspects of any other structures that may be required on the allotments.
Response – The Geotechnical Report included at Attachment 5 provides recommendations at
sections 6 and 7 for each of the proposed allotments including recommendations on footing and
geotechnical design aspects.
Ecological
Item 14 – Update the ecological assessment over the site by providing recent field data, using
current mapping and database records and addressing current statutory requirements.
Item 15 – Provide a rehabilitation plan which documents the management of the land to
ecologically restore areas outside the development footprint.
Response – Included at Attachment 6 is a comprehensive updated Ecological Assessment
prepared by James Warren and Associates which includes 2018 flora and fauna investigations on
site. The report provides a comprehensive assessment of all statutory environmental
requirements at a local, state and federal level. The report concludes that the proposed
development has been sited on the parts of the land that are considered to have limited ecological
significance.
The applicant is committed to rehabilitating the environmental reserve area, however our
ecological consultant recommends that a rehabilitation plan is more appropriately provided at
operational works application stage to ensure the rehabilitation recommendations tie in with
proposed site works once detailed engineering design is complete. Therefore the requirement to
prepare a rehabilitation plan would be accepted by the applicant as being a reasonable condition
of any development approval.
Item 16 – Provide an amended layout, informed by the required revised ecological study, which
includes the development located at least 10 metre from the top of bank and removes any new lot
boundaries traversing the creek and 10 metre offset.
P: 07 5452 5207
E: [email protected]
45 First Ave, Mooloolaba Qld 4557
PO Box 1043 Maroochydore Q 4558
Page 6 of 19 townplanningsunshinecoast.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Response letter to Council Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 649 KB (small file)
- File type
No other editions are linked here.