Skip to the record
Accept no substitutions.

Original source · versioned page text

Attachment 6- Ecology report prepared by Gondwana Ecology

Attached to the e-mail Response to Information Request ( 2nd email) - RAL18/0023.

of 37

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

     •    All understorey up to 6m in height will be removed and the ground fuels maintained at <8
          tonnes/ha by physical means.
     •    This will be the ongoing responsibility of the owner of Lot 12.
     •    Bollards/survey markets to be installed along the bushfire management zone

Cov J - continue to function as a stormwater drainage area

The maintenance for disturbed planted areas is to be for a period of 24 months following completion
of initial planting. Weed control is to form part of the monitoring and maintenance. The performance
objective/signoff criteria and corrective actions are listed in Table 5 below. Maintenance of the areas
should be undertaken quarterly as necessary; however it would be expected that greater levels of
attention will be necessary at the initial stages.
Table 5. Target Criteria and Corrective Actions for Open Space Areas

 Target at 24 Months                                          Corrective Action
 No significant weed establishment in the open space areas    implement weed control
 No significant bare areas/erosion                            implement infill planting, stabilisation
 Planted plants showing signs of health and vigour            water, replace
 Fencing intact                                               Replace/repair
 Cov L – maintain for bushfire management                     vegetation clearing to reduce fuel loads


Open space management actions and ongoing maintenance to be implemented by suitably qualified
contractor with advice sought from ecologist where necessary.

Monitoring to be completed by appropriately qualified ecologist at 12 months with report for Council
at 24 months (i.e. to confirm achievement of sign-off criteria to a satisfactory level).




Ecology Report – Lot 3 SP 246584 Noosa Civic                                                             18
Log in to download the original file

Attachment 6- Ecology report prepared by Gondwana Ecology.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.