Rebecca Stead 20248-001-Rev0
3 September 2020
and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial
and Residential Developments.
Fill embankment edges must be over-filled by 0.5 m (horizontally) and then trimmed back to well compacted
material.
4.2.3 Excavations
Excavations through the existing soils should be achievable using conventional earthmoving plant (e.g. small
to medium excavators in the 4 tonne to 12 tonne range). Unsurcharged temporary cuts in the very loose to
loose sands could be formed at 1V:2H, for batters up to 2 m in height. If groundwater seepage is encountered,
flatter batters may be required. Deeper cuts, if required, should be specifically assessed by Tectonic. All
permanent cut/fill batters must be supported by engineer designed retaining walls.
If the above temporary batter slopes cannot be achieved, due to spatial restraints, temporary shoring will be
required. Excavations in close proximity to existing footings will need to be specifically designed to prevent
undermining. It is recommended that footing exposures or confirmation of foundations via certified building
plans be undertaken to assess the possibility of undermining. If undermining is a potential issue the existing
structures may need to be underpinned or the excavation may require temporary shoring such as sheet
piles.
The advice of a suitably qualified and experienced RPEQ structural engineer must be sought regarding any
potential undermining and design and construction of any underpins/temporary shoring (if required).
The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).
Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the
ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be
graded to ensure free drainage of stormwater away from construction areas, and to a control point(s).
4.3 Footings
Due to the very loose to loose density of the upper sands, moderate slope of the site and slope stability
constraints, the site is classified Class P in accordance with AS2870-2011. However, the natural soil
profile at the site would exhibit the characteristics of a Class S site with an approximate characteristic
surface movement (ys) of up to 20 mm.
No design loadings were available at the time of reporting, however it is noted that a suspended first floor
slab is proposed, and in some areas structure loads may be relatively high. Footings for the proposed
extensions and carport (including retaining walls and pool) must penetrate through any fill and unsuitable
soils to be founded at least 1 m into medium dense (or denser) sands and be founded a minimum of 3 m
BGL (existing ground levels). Steel screw piles would be a suitable footing option for this site.
It was noted that the eastern side of the residence appeared to have settled previously with cracking and
vertical separation noted in the blockwork. Based on this evidence it is recommended that the existing
footings should not be re-used for additional loads imposed by the extensions. Furthermore, it is also
recommended that the eastern edge of the residence be underpinned using screw piles founded at least 1 m
into medium dense (or denser) natural sand. Any new internal footings within the existing structure footprint
(i.e. for new columns, etc.), will need to extend below the existing concrete slab to be founded at least 0.5 m
into medium dense (or denser) sands at about 2 m depth. Screw piles so founded may be designed using an
allowable end bearing pressure of 300 kPa.
Due to the presence of loose sands, together with the close proximity of adjacent structures, open bored
piles or driven piles are not considered to be suitable for this site. The advice of a specialist piling contractor
must be sought regarding feasibility, design and installation of the piling system for this site, including an
assessment of potential vibration effects on nearby structures, and monitoring requirements.
All footings should be founded such that they are not adversely affected by any adjacent excavations, batter
slopes, trenches, retaining walls, or in ground structures (e.g. swimming pool) that are not designed to
support building loads. Footings should be founded at least below a plane extending 1 m horizontally from
10/12
Document Set ID: 23080488
Version: 1, Version Date: 27/06/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Geotechnical Investigation Report - DBW24/0090 & RAP24/0025Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.