35. P rovide a detailed break dow n of the proposed parking arrangem ents, including:
(d) Any secure residential parking
(e) Any proposed allocated/ reserved spaces
(f) Any spaces available for shared use
(g) Any other restrictions on access and/ or tim es of parking.
Response:
Refer item 13 of correspondence from TTM Consulting included in Attachment 1. This provides a
breakdown of the proposed parking arrangements.
36. P lans clearly identifying the parking space allocations for the developm ent.
Response:
Amended plans prepared by Mode Design are attached. These plans show the carparking areas.
Stage 1 parking will be available for all users. With stage 2, parking within the residential and
commercial lots will be dedicated for their respective uses.
Hydraulics & Water Quality Unit
37. P rovide an am ended w ater quality strategy (catchm ent plan and location of devices)
w hich dem onstrates separation of w ater quality im provem ent betw een future public
and private land .
Response:
Refer to correspondence from TOD Consulting Engineers included in Attachment 2 together with the
attached amended Integrated Water Management Plan prepared by Aquaintel. This correspondence
and report demonstrates separation of water quality improvement between future public and private
land.
38. P rovide prelim inary long section and cross section detail of Storm w ater Treatm ent
Basin A. Given that each of these devices w ill be adjacent to public thoroughfare and
w ill form part of the visual am enity of the area; the m ax im um drop into the device
should not require a safety fence and batters/ retaining structures should be in
accordance w ith Section 3.3.5 of Bioretention Technical Design Guidelines version 1.
Response:
Refer to correspondence from TOD Consulting Engineers included in Attachment 2 together with the
attached amended Integrated Water Management Plan prepared by Aquaintel. This correspondence
and report detail that Stormfilter treatment devices have now been proposed in lieu of previously
proposed bio filtration basin A.
39. I n concurrence w ith landscape inform ation request item s, and concerns raised over
Storm w ater Treatm ent Basin A, investigate w ays to distribute and integrate w ater
quality im provem ent devices into areas of Carpark w hich w ill rem ain unaffected by
potential future developm ent.
Response:
Refer to correspondence from TOD Consulting Engineers included in Attachment 2 together with the
attached amended Integrated Water Management Plan prepared by Aquaintel. This correspondence
and report indicate ways to distribute and integrate water quality improvement devices into areas of
Carpark which will remain unaffected by potential future development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.