Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Cover letter_Information Response

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

35. P rovide a detailed break dow n of the proposed parking arrangem ents, including:
(d) Any secure residential parking
(e) Any proposed allocated/ reserved spaces
(f) Any spaces available for shared use
(g) Any other restrictions on access and/ or tim es of parking.

Response:
Refer item 13 of correspondence from TTM Consulting included in Attachment 1. This provides a
breakdown of the proposed parking arrangements.

36. P lans clearly identifying the parking space allocations for the developm ent.

Response:
Amended plans prepared by Mode Design are attached. These plans show the carparking areas.
Stage 1 parking will be available for all users. With stage 2, parking within the residential and
commercial lots will be dedicated for their respective uses.

Hydraulics & Water Quality Unit

37. P rovide an am ended w ater quality strategy (catchm ent plan and location of devices)
    w hich dem onstrates separation of w ater quality im provem ent betw een future public
    and private land .

Response:
Refer to correspondence from TOD Consulting Engineers included in Attachment 2 together with the
attached amended Integrated Water Management Plan prepared by Aquaintel. This correspondence
and report demonstrates separation of water quality improvement between future public and private
land.

38. P rovide prelim inary long section and cross section detail of Storm w ater Treatm ent
    Basin A. Given that each of these devices w ill be adjacent to public thoroughfare and
    w ill form part of the visual am enity of the area; the m ax im um drop into the device
    should not require a safety fence and batters/ retaining structures should be in
    accordance w ith Section 3.3.5 of Bioretention Technical Design Guidelines version 1.

Response:
Refer to correspondence from TOD Consulting Engineers included in Attachment 2 together with the
attached amended Integrated Water Management Plan prepared by Aquaintel. This correspondence
and report detail that Stormfilter treatment devices have now been proposed in lieu of previously
proposed bio filtration basin A.

39. I n concurrence w ith landscape inform ation request item s, and concerns raised over
    Storm w ater Treatm ent Basin A, investigate w ays to distribute and integrate w ater
    quality im provem ent devices into areas of Carpark w hich w ill rem ain unaffected by
    potential future developm ent.

Response:
Refer to correspondence from TOD Consulting Engineers included in Attachment 2 together with the
attached amended Integrated Water Management Plan prepared by Aquaintel. This correspondence
and report indicate ways to distribute and integrate water quality improvement devices into areas of
Carpark which will remain unaffected by potential future development.
Log in to download the original file

Cover letter_Information Response.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.