NOOSA BOWLS CLUB REDEVELOPMENT – COLES GROUP
RESPONSE TO COUNCIL INFORMATION REQUEST FOR MCU




    1. INTRODUCTION
     The information below has been prepared to respond to items 37- 40 & 44 - 45 of
    the Information Request issued by Sunshine Coast Council dated 5 June 2013 for
    MCU 13/0086. The information below should be read in conjunction with the
    following documents:

           Tod Consulting Plans 12691 – sheets SW2, SW3, SEW1
           Aquaintel Integrated Water Management Plan (IWMP), Noosa Tavern
            Development, Noosa Fair – Rev D


    2. RESPONSE TO INFORMATION REQUEST ITEMS

        2.1.       Item 37
    Information Required

    Provide an amended water quality strategy (catchment plan and location of devices)
    which demonstrates separation of water quality improvement between future public
    and private land

    Response

    Stormfilter treatment devices (proprietary devices by Stormwater 360) have been
    added to treat the runoff from the proposed specialty shops within the existing Noosa
    Fair property fronting Pinaroo Way. The existing and developed catchments for this
    area are unchanged so no detention is required. Treated stormwater will be directed
    into the existing stormwater drainage system within the site. Refer to revised IWMP
    by Aquaintel for further details.

        2.2.       Item 38
    Information Required

    Provide preliminary long section and cross section detail of Stormwater Treatment
    Basin A. Etc

    Response

    Stormfilter treatment devices have been proposed in lieu of previously proposed bio
    filtration basin A. Catchment A has been split into two areas and two separate
    Stormfilters have been proposed to treat the runoff from these catchments. Due to
    the vertical drop required across the Stormfilter device it is proposed to extend and
    lower the existing stormwater outlet for Catchment A1 to Pinaroo Park by
    approximately 10-15m utilising the fall available in the existing open drain. The new


                                                                             13 August 2013
                                                                                 Page 1 of 2
Log in to download the original file

Cover letter_Information Response.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.