Council archive · source document
Extension to Currency Period Report - RAL21 0012 01 (As Published) · RAL21/0012.01
EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
2. BACKGROUND
A development approval for a Reconfiguring a Lot (1 Lot into 3 Lots) was issued on 26 August
2021.
Figure 1 – Proposed Subdivision Plan
3. ASSESSMENT
The applicant has requested an extension to the currency period to the development approval
under section 86 of the Planning Act 2016.
The applicant seeks a four-year extension to the currency period of the development approval
issued on 26 August 2021. The site is located within the Medium Density Residential Zone under
the Noosa Plan 2020, and the approved subdivision remains generally consistent with the
intended residential outcomes for the locality.
The approval continues to align with the zone intent and there have been no significant changes
to the planning scheme or site constraints that would render the development inappropriate.
However, the request would result in a total currency period of nine years, which is considered
excessive for a small-scale subdivision of this nature.
Page 2 of 3
Document Set ID: 24836595
Version: 4, Version Date: 17/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period Report - RAL21 0012 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 714 KB (small file)
- File type
No other editions are linked here.