Skip to the record
Search everything, all in one place.

Council archive · source document

Extension to Currency Period Report - RAL21 0012 01 (As Published) · RAL21/0012.01

of 3

Text shows just the words. Original shows the document exactly as it was published.

               EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
               A prolonged currency period increases the risk that the approval may become inconsistent with
               evolving planning controls, infrastructure planning, and contemporary design or engineering
               standards. It may also delay the timely delivery of housing supply in an appropriately zoned and
               serviced urban area.
               While an extension is reasonable given the approval remains fundamentally sound, a more
               moderate extension is considered appropriate to balance flexibility for the applicant with the need
               to maintain alignment with current and future planning outcomes.
               4.     CONCLUSION
               It is recommended that the request to extend the currency period be approved in part, with a two
               (2) year extension to 28 August 2028.
               This timeframe provides sufficient opportunity for the applicant to act on the approval while
               ensuring the development remains reasonably aligned with contemporary planning and
               infrastructure expectations.
               RECOMMENDATION
               That Council note the report regarding Application No. RAL21/0012.01, for a Development Permit
               for Reconfiguring a Lot - Extension to Currency Period situated at 100 Hilton Terrace, Noosaville
               Qld 4566 described as Lot 1 on SP315600 , and approve the extension to the currency period
               and amend condition 4 to read as follows:
               Currency Period
               4.     This development approval lapses if the requirements of the conditions have not been
                      completed and an application for plan seal is not lodged with Council by 28 August 2028,
                      unless an application to extend the currency period is approved by Council.




                                                                                                     Page 3 of 3

Document Set ID: 24836595
Version: 4, Version Date: 17/06/2026

Used in these records

About this file

File size
714 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period Report - RAL21 0012 01 (As Published).pdf · 714 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.