HRP18103.L02.002_Change application · MCU16/0133.01
Attached to the e-mail Change to Development Application - MCU16/0133.01.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
MCU16/0133
5. Landscape works must:
a. Take all measures to prevent Fire Ants (or any stages of the fire ant life
cycle) entering the work site.
b. Take all measures to prevent Myrtle Rust infection.
c. Not obstruct overland flow paths and must include adequate drainage to
minimise ponding. Mulch or any floatable material must not be located in
swales, overland flow paths or around grated drains.
d. Not encroach onto kerb and channel, footpaths, pedestrian or vehicular/
circulation areas.
e. Not restrict access to service meters.
f. Delineate all garden to grassed area interfaces with a hard edge.
g. Ensure sales signage and ancillary infrastructure is not installed within the
road reserve.
h. Ensure permanent irrigation is not installed within the road reserve.
i. Ensure all weeds and debris are removed from planting areas prior to
planting.
j. Ensure mulch is aged, comprised of leaf and limb material of varying sizes,
free of foreign matter including anthropogenic waste, rock, soil / sediment
contamination and is applied to ensure a minimum 100mm depth once
settled.
6. Soil provided for landscaping must provide for the site specific vegetation
performance objectives.
7. All landscape works must be completed prior to the commencement of use.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
8. At least 5 working days prior to any works commencing, written advice must be
provided to Council detailing:
a. The name, contact details and ACN for the supervising Registered
Professional Engineer of Queensland (RPEQ) and Principal Contractor.
b. Proposed dates for commencement and completion of construction.
9. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible
to ensure that any subcontractors also have the appropriate insurance and public
liability documentation. Certificates demonstrating currency of public liability
insurance and works insurance covering the works must be submitted to Council
prior to the prestart meeting.
10. Council must be contacted at least 5 working days prior to any works commencing
to organise a prestart meeting*. The contact number to arrange a prestart meeting
is 5329 6291. The prestart meeting must include the relevant parties for the
following aspects of the works:
a. Civil engineering works.
b. Landscape works.
Page 7 of 21
Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017 Print Date: 22 February 2017, 1:04 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
HRP18103.L02.002_Change application.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.