                                                                                                         MCU16/0133


                              d.       Achieve the desired environmental outcomes.
                              Council may request further controls to be installed should the implemented
                              measures be found inefficient.
                      34.     The erosion and sediment control measures must be designed, installed and
                              maintained in accordance with the supervising engineer instructions and the
                              current best practice standards (refer to advisory notes).
                      35.     The applicant must ensure non essential exposure of soil is prevented by
                              restricting the extent of clearing and minimising the duration of soil exposure to
                              adverse weather conditions and effectively turf or stabilise any cleared area
                              without delay and prior to rainfall occurring.
                      36.     The applicant must ensure sediment does not leave the site or enter onto adjoining
                              properties or Council’s drainage system due to surface runoff or on tyres of
                              vehicles and/or machinery. It is essential to implement appropriate approved
                              erosion and sediment control measures throughout the site during all phases of
                              construction including vehicle shakedown pad/grid (or similar) at the access to the
                              construction site.
                      37.     Prior to the completion of the development and commencement of use, all site
                              surfaces must be effectively stabilised using methods which have achieved
                              effective short-term stabilisation and which will continue to achieve effective
                              stabilisation in the medium to long-term. For the purpose of this condition, an
                              effectively stabilised surface is defined as one that does not, or is not likely to
                              result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to
                              sedimentation, or lead to water contamination.(for larger sites)
                              Damage to Services and Assets
                      38.     Any damage caused to existing services, streetscape and assets (including kerb
                              and footpath) as a result of the development works must be repaired at no cost to
                              the asset owner at the following times:
                              a.       Where the damage would cause a hazard to pedestrian or vehicle safety,
                                       immediately; or
                              b.       Where otherwise, upon completion of the works associated with the
                                       development.
                              Any repair work which proposes to alter the alignment or level of existing services
                              and assets must first be referred to the relevant service authority for approval.
                              FOLLOWING CONSTRUCTION
                              Certification
                      39.     Upon completion of the work and prior to the final inspection a certificate must be
                              issued by an RPEQ certifying that the works have been constructed in accordance
                              with the Operational Works permit and applicable engineering standards.
                      40.     A final inspection and approval of the completed works by Council’s Inspector is
                              required. Please contact Council on 5329 6291 to arrange for the inspection.
                              As Constructed Plans/On Maintenance
                      41.     All municipal works must be accepted ‘On Maintenance’ by Council in accordance
                              with Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the
                              supervising RPEQ must submit to Council:




                                                                                                             Page 12 of 21


Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017                                                                  Print Date: 22 February 2017, 1:04 PM

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

HRP18103.L02.002_Change application.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.