Works within Road Reserve and Reinstatement Works
25. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath and/or road closures be necessary to carry
out construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
26. Where required, any reinstated road pavement must be in accordance with IPWEA
standard drawing RS-170 with road pavement resurfacing to consist of a minimum
depth of 50mm of an approved hot mixed asphaltic concrete.
27. Any existing kerb & channel and concrete footpath sections requiring removal due
to the new works must be saw-cut and removed to allow for a smooth and neat
finish with the new works.
Earthworks
28. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical supervision and testing undertaken in accordance with Section 8 of
the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B.
29. All Earthworks and construction works must be carried out taking into
consideration the protection of any existing above and below surface services, and
the stability and protection of fences and any buildings and structures on the
adjoining properties.
Stormwater Drainage
30. Stormwater drainage for the site must be provided generally in accordance with the
approved plans and must be supervised by RPEQ and its compliance with the
design and the relevant standards be included in the completed works certification
by the RPEQ.
31. Works associated with this permit must not adversely impact on the existing
drainage conditions on other properties including road and public footpath by
blocking or interfering with overland flow path.
32. Construction of all internal stormwater drainage works must comply with the
relevant section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
33. Sediment and erosion control measures must be in place prior to works
commencing. If such measures are not in place or are not satisfactory, “on the
spot” fines may be issued. Such fines can be issued if sediments from the site are
found to enter or have the potential to enter Council’s stormwater system, natural
waterways, any downstream stormwater filtration system or adversely impacting on
other properties. The sediment and erosion control design and measures have
NOT been approved, it is the site's Supervising Engineer who is responsible for
ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance
with "best practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by
changes in the projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events, and
Page 11 of 21
Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017 Print Date: 22 February 2017, 1:04 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
HRP18103.L02.002_Change application.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.