HRP18103.L02.002_Change application · MCU16/0133.01

Attached to the e-mail Change to Development Application - MCU16/0133.01.

of 67

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




                                                                                                    MCU16/0133


                              Works within Road Reserve and Reinstatement Works
                      25.     Safe pedestrian access on all streets in the vicinity of the development must be
                              maintained at all times. Should footpath and/or road closures be necessary to carry
                              out construction works, Council’s Engineering Officer must be notified prior to the
                              proposed closure and all requirements complied with.
                      26.     Where required, any reinstated road pavement must be in accordance with IPWEA
                              standard drawing RS-170 with road pavement resurfacing to consist of a minimum
                              depth of 50mm of an approved hot mixed asphaltic concrete.
                      27.     Any existing kerb & channel and concrete footpath sections requiring removal due
                              to the new works must be saw-cut and removed to allow for a smooth and neat
                              finish with the new works.
                              Earthworks
                      28.     All earthworks must be undertaken in accordance with the provisions of AS 3798
                              Guidelines on Earthworks for Commercial and Residential Development, with
                              geotechnical supervision and testing undertaken in accordance with Section 8 of
                              the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B.
                      29.     All Earthworks and construction works must be carried out taking into
                              consideration the protection of any existing above and below surface services, and
                              the stability and protection of fences and any buildings and structures on the
                              adjoining properties.
                              Stormwater Drainage
                      30.     Stormwater drainage for the site must be provided generally in accordance with the
                              approved plans and must be supervised by RPEQ and its compliance with the
                              design and the relevant standards be included in the completed works certification
                              by the RPEQ.
                      31.     Works associated with this permit must not adversely impact on the existing
                              drainage conditions on other properties including road and public footpath by
                              blocking or interfering with overland flow path.
                      32.     Construction of all internal stormwater drainage works must comply with the
                              relevant section/s of Australian Standard AS/NZS 3500.3.
                              Erosion and Sediment Control
                      33.     Sediment and erosion control measures must be in place prior to works
                              commencing. If such measures are not in place or are not satisfactory, “on the
                              spot” fines may be issued. Such fines can be issued if sediments from the site are
                              found to enter or have the potential to enter Council’s stormwater system, natural
                              waterways, any downstream stormwater filtration system or adversely impacting on
                              other properties. The sediment and erosion control design and measures have
                              NOT been approved, it is the site's Supervising Engineer who is responsible for
                              ensuring that the sediment and erosion control measures have:
                              a.       Been duly designed by an RPEQ or CPESC and constructed in accordance
                                       with "best practise" methods,
                              b.       Been revised by an RPEQ or CPESC to address the issues raised by
                                       changes in the projected construction schedule and/or methods,
                              c.       Been revised to address predicted rainfall events, and




                                                                                                        Page 11 of 21


Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017                                                             Print Date: 22 February 2017, 1:04 PM

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

HRP18103.L02.002_Change application.pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.