6. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and drawings
has not been undertaken, as they have been certified by a RPEQ. The RPEQ
bears full responsibility for all aspects of the engineering design. Council reserves
the right to require further amendments and/or additions at a later date should
design errors become apparent.
7. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for extended
periods of time.
8. Amendments to plans, in accordance to the relevant conditions, and/or any
requested changes to the conditions of this decision notice must be made within
the appeal period or the suspended/extended appeal period. Alternatively, an
application for “Request to change an existing approval” under the Sustainable
Planning Act 2009 must be made along with Council’s applicable fees.
9. It should be noted prior to arranging a pre-start meeting the Right of Appeal Period
of 20 business days should have been passed or the applicant has have confirmed
by a letter or an email that he/she has accepted the conditions of Decision Notice
and waived his/her appeal right.
Erosion and Sediment Control
10. Accepted best practice standards include:
a. the Sunshine Coast Regional Council Manual for Erosion and Sediment
Control V1.2 or other superseding document subsequently adopted by
Council;
b. Best Practice Erosion and Sediment Control, International Erosion Control
Association (2008)
11. As a general rule, a site is determined to have achieved effective short-term
stabilisation if at the completion of the works:
a. Methods of stabilisation are:
i. appropriate for slopes and slope lengths; and
ii. are consistent with best practice environmental management practices
such as in the Manual for Erosion and Sediment Control or the IECA
Manual; and
b. Stormwater runoff from the site is not currently, and is not likely to result in
visible evidence of sedimentation or erosion, or lead to water contamination.
If at the time of the completion of the works, the method of short-term
stabilisation has not achieved a level of stability that Council's Officers
believe will have a high probability of achieving long term stability, Council
Officers may take the following matters into consideration in determining
whether the site is capable of achieving medium to long-term stability:
c. Evidence that the site has been effectively stabilised in the short term;
d. Evidence that soil has been adequately ameliorated;
Page 15 of 21
Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017 Print Date: 22 February 2017, 1:04 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
HRP18103.L02.002_Change application.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.