16. Waste storage areas, clothes drying areas and external storage areas must be screened
from view of the street.
Protection of Privacy
17. The upper level balconies located on the eastern elevation of Units 3-6 must include either
balcony planter boxes, balustrading or fixed external screens, positioned in such a way to
obscure direct views into the habitable room windows or private open space areas of the
adjoining property. Any fixed external screen(s) must not extend more than 50% of the length
of the balcony.
Water & Sewer Connections
18. An underground connection to reticulated water and sewerage must be provided to the
premises in accordance with the standards and requirements of Northern SEQ Distributor–
Retailer Authority (Unitywater).
19. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
must be submitted to Council that certifies an underground connection to reticulated water
and sewerage has been provided to the premises.
Noise – Services and Pool Equipment
20. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
i. 7am to 10pm: Maximum level allowable = background + 5dB(A)
ii. 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps, Service Room
i. 7am to 7pm: Maximum level allowable = background + 5dB(A)
ii. 7pm to 10pm: Maximum level allowable = background + 3dB(A)
iii. 10pm to 7am: No audible noise.
21. The certification must be submitted to Council, which certifies that operational noise from any
fixed plant and equipment complies and with the requirements of this Decision Notice.
External Works
22. Elanda Street must be upgraded for the length of its frontage to the subject site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. construction of kerb and channelling to the development side only
b. widening and sealing of the existing road pavement to the centreline of Elanda Street.
c. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice
d. relocation of the existing overhead electricity pole
e. removal of the existing property access and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed
Condition 22 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Site Access and Driveways
23. A sealed access driveway must be provided from Elanda Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24 0153 & OPW24 0202 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.