Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Amended DA Form 1 MCU18-0008 & OPW18-0013

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (12.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Department of Infrastructure, Local Government and Planning

 

 

L] Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

J Not required

 

Section 2 — Further development details

7) Does the proposed development application involve any of the following?

 

 

Material change of use L] Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot (J Yes — complete division 2

Operational work LI Yes — complete division 3

Building work (J Yes — complete DA Form 2 — Building work details

 

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.

8.1) Describe the proposed material change of use

 

 

 

 

 

 

 

 

Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)
(upe - [ndustriot Business 6 TUT Ft]
(I Is pe o-
8.2) Does the proposed use involve the use of existing buildings on the premises?
LJ Yes
LJ No

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
LJ Subdivision (complete 10) CJ Dividing land into parts by agreement (complete 11)

L] Boundary realignment (complete 12)) LJ Creating or changing an easement giving access to a lot from
a construction road (complete 13))

 
 
  

 

  
 

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots:

Commercial Industrial Other, please specify:

   
 

Residential

   
 

Intended use of lots created

 

 

 

Number of lots created N/A

10.2) Will the subdivision be staged?

C1 Yes - provide additional details below

No

How many stages will the works include? N/A

What stage(s) will this development application
apply to?

 

 

 

 

 

 

 

Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017
Log in to download the original file

Amended DA Form 1 MCU18-0008 & OPW18-0013.pdf · 12.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.