Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Amended DA Form 1 MCU18-0008 & OPW18-0013

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (12.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Department of Infrastructure, Local Government and Planning

 

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the

eyelid

 

Intended use of parts created Residential Commercial Industrial Other, please specify:

 

 

Number of parts created

 

 

 

 

 

12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?

Current lot Proposed lot

 

 

Lot on plan description Area (m?) Lot on plan description Area (m?)
N/A

 

 

 

 

 

 

 

 

12.2) What is the reason for the boundary realignment? i

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?

 

(attach schedule if there are more than two easements)

 

Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
N/A

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.

14.1) What is the nature of the operational work?

LJ Road work C Stormwater L] Water infrastructure
LJ Drainage work CJ Earthworks (J Sewage infrastructure
(Landscaping CJ Signage C1 Clearing vegetation
LJ Other — please specify:

 
    

  
   
  
   
    

 

 

 

14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

 
  
   

C1 Yes — specify number of new lots:
LJ No

14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
$30 000

   

 

 

  
  
  

 

PART 4 —- ASSESSMENT MANAGER DETAILS

15) Identify the assessment manager(s) who will be assessing this development application

 

16) Has the local government agreed to apply a superseded planning scheme for this development application?

L Yes — a copy of the decision notice is attached to this development application

L Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached

LJ No

 

PART 5 — REFERRAL DETAILS

17) Do any aspects of the proposed development require referral for any referral requirements?

Page 5
DA Form 1 — Development Application details
Version 1.0—3 July 2017
Log in to download the original file

Amended DA Form 1 MCU18-0008 & OPW18-0013.pdf · 12.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.