Original source · versioned page text
Appendix E Copy Exising Development Permit
132006.215.3 Roadworks Contributions (Local Road Network) 27. A roadworks contribution of $1580 towards the upgrading of David Low Way and Heron Street shall be paid to the Council prior to obtaining a Development Permit for Building Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2006 until the date of payment. The money will be used to assist Council with the cost of streetscaping around the neighbourhood centre of Peregian. Pathway Contributions 28. A pathway contribution of $854 towards external major pathways, in accordance with Planning Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council prior to obtaining a Development Permit for-Building Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2006 until the date of payment. Stormwater Drainage 29. Stormwater system shall generally be designed in accordance with the submitted Stormwater Management Plan prepared by Duke Environmental and dated April 2006, except as modified herein. 30. Roof runoff from the new buildings shall be directed to a rainwater storage system or tank (minimum storage 3190 litres) that is installed to ensure water from the tank can be used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 - Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval. The location and capacity of the tank shall be clearly shown on the plans submitted for Building Works approval and any overflow shall be directed to kerb and channel of the carpark on the David Low Way frontage. 31. All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged to Council's kerb & channel street drainage system in the carpark on the David Low Way frontage of the site. The maximum discharge of stormwater drainage allowable to Council's kerb & channel street drainage system at any one location is 25 litres/second. 32. All site stormwater drainage shall be by means of a gravity system. Sewer Mains 33. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in accordance with Council's standards and requirements at no cost to Council. Town Water Supply 34. The site shall be connected to Council's existing town water supply and be constructed in accordance with Council's standards and requirements at no cost to Council. 35. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Where multiple units including leased buildings are served by a single service, multiple water meters to each individual unit or leased building shall be installed. All fees for the supply of water meters shall be paid to the Council. PD-DA-FM383/5-09/08/2010 Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.