Original source · versioned page text
Appendix E Copy Exising Development Permit
132006.215.3 Headworks Contributions 36. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates under the current policies is outlined below. These amounts will be adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from March 2006 until the date of payment. Water Supply $4,532 Sewerage $9,013 TOTAL $13,545 All headworks contributions must be paid prior to the issue of a Development Permit for Building Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks/Site Stability 37. 38. Earthworks carried out on site shall not affect the structural integrity of any of the existing structures that border the development site. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures, and make recommeridations on the type of foundation system(s) best suited for the proposed development. Acid Sulfate Soils 39. As the site is located below the 20m AHD and above the 5m AHD, any excavation works consisting of 100m® or greater which extends below 5m AHD will need to be carried out in accordance with State Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. \f this is applicable appropriate testing and supporting documentation prepared by a suitably qualified specialist shall be submitted to Council prior to obtaining a Development Permit for Building Works. Erosion and Sediment Control 40. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. General 41. Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. 42. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. 43. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. Atl vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. PD-DA-FM383/5-09/08/2010 Page 5 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.