Appendix E Copy Exising Development Permit

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

432006.215.3

Environmental Health

General

44.

45.

The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and
Industrial Premises’, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and
neighbouring properties. A roofed wash down area is required with a cold-water tap,
hose and drain outlet connected to sewer.

A Waste Management Plan shall be submitted prior to demolition, removal or relocation
of a building other than a shed.

A Waste Management Plan is also required for construction of any building that requires
development approval.

Waste Management Plans are required to be submitted in accordance with Planning
Scheme Policy 11, see table below.

Waste storage areas are to provide for adequate separation of all reusable, recyclable
and waste materials. These shall be located so that they are convenient and safe to use.
(Waste Management Code)

The Plan shall contain the following information:

45.1 The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.

45.2 A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled — reused or disposed.

MATERIALS ON-SITE DESTINATION
Re-use and Recycling | Disposal

Expected waste | Estimate | On-site Off-site *specify
materials volume “specify re-use or | *specify contractor and
(m?)} recycling methods | contractor and | landfill site

end user

 

 

 

 

Excavation
material

Green waste
Bricks

Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos (see
below)

Other - please
specify

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: If a demolition contractor is undertaking works, then the Waste Management table
is to be completed by the demolition contractor.

The purpose of the Waste Management Plan is to facilitate the segregation of waste for
the effective reuse and recycling of such materials. Additionally Council rewards those
who segregate waste by significantly reducing disposal fees at the landfill, some items
are free. Higher gate fees are charged for loads of mixed waste.

PD-DA-FM383/5-09/08/2010 Page 6 of 11
Log in to download the original file

Appendix E Copy Exising Development Permit.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.