Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

JNTEGRATED.PLANNING ACT.1997
Development within the limits of a
pot

For more information refer to Guide-18, for
information about prescribed: tidal work refer to
Guide 24. .

‘if you answered "yES" to.Q12, the anon
agers toler to the} ‘Ort

   
 

Ipping
“within 1000m' ofa swing
‘shipping wharf, a Moo!

      
 
   

lee i "pl
«tthe Transport infrastructure Act 19:
‘in all other situation the Port Authority t is an
Sadvice agency.

 

iMatinas. 0 aS
Formore {formation refer to. Guide 18.
“if i whe

 

   
 

 

For.

  
    

 
   

answeiéd "YES" to. Q13;-the app!
rs teferral to. Queetistand. Fire aiid:

     
 

‘Unless you answered: “NO” to Q14,'the relevant

Port Authority is the, sessment manager for the

‘al feaon and the EfvironmentalPrétection *
Agency (EPA) and Queensland Transport (QT)

i concutienca agencies for the application,

“Heritage :
For further information refer.to Guide 19.

ff you answered "YES" to Q15, the application
riggers refesral to the Queenstand Heritage

Council as concurrence agency for the
application.

“Unless you answered “none of the above” to
Q15(b), the application involves refetral-to the ,

Environmental Protection Agency as an advice
agency for the application

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
fefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources.and Water
(NRW). .

‘fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application it in
‘relation to this matter,

 

IDAS Assessment Checklist Version 20,.2 April 2007

12. Does the application involve development below high water mark’ and within the limits of a port

under the Transport Infrastructure Act 1994? -
[No
yes - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

* 13, “Does the application involve operational work: that is tidal work for a marina with more than 6

vessel berths?

Mo |

. Oo YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

r .
Se Merits ote sea oe ep a

14, Does the application involve tidal works within a strategic port land tidal reat?

NO
(YES - complete Part M of Form 4”

4 kt -

15 Does the application involve development ina heritage registered place as defined under the. ~

Queensland Heritage Act 1 992?
No -

oO YES - complete Part C of Farm 1

15(b)The application involves: (tick applicable boxes) .

CI (i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

Oi reconfiguring a {ot if the lot shares a common boundary with a protected area or

registered place under the Queensland Heritage Act 1992;
none of the above.

MA diy

16. The application i is in an area declared | to be a catchment area under the Water Act 2000 and

involves: (tick the applicable box/es)
O (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares; -

CI (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

ii

 

eee

14 High water mark.is defined in the Coastal Protection and Management Act 1995

and means the ordinary high water mark at spring tide.

19 Marina is defined in the Transport Operations {Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas ara the areas generally 50 metres seaward of high water mark adjacent to strategic port fand.

Page §.

 

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published].pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.