07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081
*
INTEGRATED PLANNING ACT 1997 .__1DAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable bow/es}
work in Coastal management district C1 (i) _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
mofe information about prescribed tidal work in Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; Or
local goverment Gdal areas refer to Guide 24 | [7] (ij) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; Of
ples you fed ne ote ato ‘0 on C1 (ii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to {i) below are ticked.
tan agency cher than EPA isthe assessment (1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
‘franager for theapplicaion, EPAisa ” o other than those works in tidal wate where the devélopment has been determined not
to be assessable against the Water Act 2000 ;
{1 (b) constructing a canal12 intended to be connected to tidal waters;
(1 (©) constructing an artificial waterway;
- (1d) rectaiming land under tidal water;
(J (e) disposing of dredge spoil or other solid waste material in tidal water;
LO (f° interfering with quarry material on State coastal land above high-water mark;
D@ draining or allowing drainage or flow of water or other matter across State -
‘coastal land above high-water mark;
a y D1 (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
* that is in an erosion prone area and above high-water mark; :
4 (1 (i). constructing a bank or bund wall to establish a ponded | pasture on land, other
. , . than State coastal land, above high- -water mark; or @
rH (iv) none of the above.
‘Operational work below high water »/10. The application involves. operational work that is: ( tick the applicable box/es)
sak information reler to Guide 18, For - 0 (i) tidaf work’ as defined under the Coastal Protection and Management Act 1995 (the
more infomation about prescribed tidal work in . Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; or
local govemnient idal.areas referto Guide 24.) [7 (ij) tidal work that is prescribed tidal work" - complete Part P of Form 1; or
Unless you answered “none of the above" to a . spe age
10, the apslicajon ‘biggers referral to D (iii) carried out within a coastal management district'S under, the Coastal Act and for -
Queensland Transport (QT) {Maritime Safety j i ‘ Flin tH _
Aid) as a concurrence agency. Oa) spesing of dredge spoil or other solid waste material in tidal water - complete Part
Locat government is the assessment manager a . mn , ,
for all prescribed tidal work. (J (b) reclaiming land under tidal water - complete Part M of Form 1; or
CJ (c) ‘ constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;
Mi) none of the above.
Coastal management 11. The application involves: (tick the applicable boxes)
For more Information refer to Guide 18, (J (i) amaterial change of use assessable under a planning scheme involving opérational
Unless you answered “none of the above" to work carried out completély or partly in a coastal management district's
Q11, the application requires assessment by the . . . . . a e
_ Environmental Protection Agency (EPA). CU (ii) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a . . . .
voneuenee agency tw the application in + the construction of a new premises with a GFA'S of at least 1000m?
relation to this matter.” « the enlargement of the GFA of existing premises by more than 1000m?
Lili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
: completely or partly in a coastal management district
Ci (iv) reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1
Mw none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastaf Prolection and Management Regulation 2003 and includes certain tidal works completely or partiy within a loca! government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed lidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely of partly within a focal government tida! area.
1§ Coastal management district is defined in sch 10 of the JPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} af that Act.
16 GFA is defined in sch 14 of the IPA lo mean the gross floor area. For a definition of haw to calculated GFA, 90 to the planning scheme against which the application is being assessed.
47 Under s117 of the Coasta! Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an arlificial waterway, musi be
aecompanied by the apptication for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.