Council archive · source document
07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081
3 ——~INTEGRATED PLANNING ACT 1997 Works that take overland flow water The relevant wild river declaration will state works that take overland flow water are either self assessable or assessable, or are exempt from wild river requirements. Hyou licked Q13 i}, your application must be assessed by NRW against the Wild’Rivers Code and must comply with the code. If you ticked. 13 if) an. ‘application i isnot: fequired to be made however the works must ply with: the relevant self-assessable séction.of-the Wild: - ‘Rivers Code, ottienwise the works. become ‘is required and must be assessed by NRW ~ “Against the relevaiit part of the Witd Rivers assessable development for which an application and must comply with the code. ~ ifyou ticked Q13 ii your application is not subjectto wild siver requirements. Applications for developmetit that is ottier than ; that stated to be assessable, self-aéséssable or- éxempt will not be accepted. . 13. ‘No IDAS Assessment Checklist, Version 20, 2 April 2007 Does the application involve works that take overland flow water in a HPA or an FMA? O YES (ensure you have completed Part Ks of Form 1) if YES, is the application for works stated in the relevant wild river declaration to be? C i) assessable works O ii) self-assessable works LJ ill) exempt works ‘Works that interfere with overtand flow water The‘relevant wild river declaration will state... works that interfere with overland flow water’ that re either self assessable, assessable or exempt, “from wild river requirements, Ifyou ticked Q15 i), your application’r must be. ‘assessed by NRW against the Wild Rivers Codé and must comply.with the code. * Ifyou ticked Q15 ii) an application is not required to be made however the works.must comply with the relevant self-assessable section-of thie Wild ‘Rivers Code, olherwise the works become ~€ssessable development for which an application is required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. Hf you ticked Q15 ili) your application ts not + Subject to wild river requirements. Applications for development that Is other than . that stated to be assessable, self-assessable or . exempt will not be accepted. Does the application involve works that interfere with overland flow water in a FMA? oO NO Oo YES (ensure you have completed Part Kio of Form 1) If YES, is the application for works stated in the relevant wild rivers deciaration tobe? QO i) assessable works QO ii) self-assessable works Di) exempt works Waterway barrier works Applications for building of raising waterway barrier works in a HPA will not be accepted. If you answered YES.to Q16, your application . ‘émust be assessed by DPIF against the Wild Rivers Code and must comply with the.code. T16. Does the application involve building or raising waterway barrier works in a PA? oO NO | YES (ensure you have completed Part O3 of Form 1) Aquaculture (Ron ERA) Applications for aquaculture in a HPA will not be accepted. Ifyou answered YES to Q17, your application - must be assessed by DPIF against the Wild Rivers Code and must comply with the code. Does the application involve aquaculture in a PA? O NO O YES (ensure you have completed Part Os of Form 1) Works that interfere with water in a watercourse Note: If the development is proposed in a HPA, applications for alt works that interfere with water in a watercourse (including dams or weirs, stream realignment or stream diversion) will not be accepted. in a PA, applications for instream dams and weirs may be accepted in nominated waterways. If you ticked box ii) in Q19, your application wilt not be accepted, “Note: Operational works outside a HPA or nominated waterway are not subject-to wild river requirements. More information and locations of nominated waterways is available by contact NRW, accessing the department's website www. nrw.qld.cov.au or contacting the department by. email on: wild [email protected] the application involve operational works that interfere. with water in a watercourse that is in a nominated waterway in a PA? , 0 NO oO YES (ensure you have completed the relevant Part K of Form 1) If YES, Oo i) The application is for an instream dam or weir; or O it) The application is for operational works that interfere with water in 4 watercourse, and is for development other than a dam or weir.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.