07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

3

——~INTEGRATED PLANNING ACT 1997

Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

Hyou licked Q13 i}, your application must be
assessed by NRW against the Wild’Rivers Code

 

and must comply with the code.
If you ticked. 13 if) an. ‘application i isnot: fequired
to be made however the works must ply with:

the relevant self-assessable séction.of-the Wild: -

‘Rivers Code, ottienwise the works. become

‘is required and must be assessed by NRW ~
“Against the relevaiit part of the Witd Rivers

assessable development for which an application

and must comply with the code. ~

ifyou ticked Q13 ii your application is not
subjectto wild siver requirements.

Applications for developmetit that is ottier than ;
that stated to be assessable, self-aéséssable or-
éxempt will not be accepted.

.

  

13.

‘No

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

O YES (ensure you have completed Part Ks of Form 1)

if YES, is the application for works stated in the relevant wild river declaration to be?
C i) assessable works

O ii) self-assessable works

LJ ill) exempt works

 

‘Works that interfere with overtand
flow water

The‘relevant wild river declaration will state...
works that interfere with overland flow water’ that
re either self assessable, assessable or exempt,

“from wild river requirements,

Ifyou ticked Q15 i), your application’r must be.

‘assessed by NRW against the Wild Rivers Codé

and must comply.with the code. *

Ifyou ticked Q15 ii) an application is not required
to be made however the works.must comply with
the relevant self-assessable section-of thie Wild

‘Rivers Code, olherwise the works become
~€ssessable development for which an application

is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Hf you ticked Q15 ili) your application ts not

+ Subject to wild river requirements.

Applications for development that Is other than

. that stated to be assessable, self-assessable or
. exempt will not be accepted.

 

Does the application involve works that interfere with overland flow water in a FMA?
oO NO Oo YES (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers deciaration tobe?
QO i) assessable works

QO ii) self-assessable works

Di) exempt works

 

Waterway barrier works

Applications for building of raising waterway
barrier works in a HPA will not be accepted.

If you answered YES.to Q16, your application .
‘émust be assessed by DPIF against the Wild
Rivers Code and must comply with the.code.

T16.

Does the application involve building or raising waterway barrier works in a PA?
oO NO | YES (ensure you have completed Part O3 of Form 1)

 

Aquaculture (Ron ERA)

Applications for aquaculture in a HPA will not be
accepted.

Ifyou answered YES to Q17, your application

- must be assessed by DPIF against the Wild

Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?
O NO O YES (ensure you have completed Part Os of Form 1)

 

 

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for alt works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

in a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your application wilt
not be accepted,

“Note: Operational works outside a HPA or

nominated waterway are not subject-to wild
river requirements.

More information and locations of nominated
waterways is available by contact NRW,

accessing the department's website

www. nrw.qld.cov.au or contacting the

department by. email on:

wild [email protected] the application involve operational works that interfere. with water in a watercourse that is in
a nominated waterway in a PA? ,

0 NO oO YES (ensure you have completed the relevant Part K of Form 1)

If YES,
Oo i) The application is for an instream dam or weir; or

O it) The application is for operational works that interfere with water in 4 watercourse, and is
for development other than a dam or weir.

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published].pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.