Skip to the record
Every meeting, every word.

Council archive · source document

07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 
 
   

 

 

Environmentally relevant activities 20. Doés the application involve an ERA?’
“Most applications for. an ERA in a HPA will not :
“be accepted. Applications which may be made O NO QO YES (ensure you have completed Part G of Form)
* require referral to the EPA. The assessment of
somne ERAS is asséssed by NRW, othershave 121. Is the application for an ERA 20 instream?
‘been devolved to OPIF, ‘NRW or delegated
govemment (see EPA website for more. O NO O YES
tion on devolved ERAs) : . .
~lfyou anowera NO to 20 you donataeedio:|99. Isa quarry allocation notice held for the proposed ERA 20 instream?
. ( : LJ No ClyYes
‘| 23. Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
men , iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
forthe’ development by: ‘answering tase 024. the Wild Rivers Act 2005, and Environmental Protection Act 1994)
“you answered ‘NO to O21, you'ds not need to: ..iv) an ERA 22 (out of stream) ‘ 4
Ljno . Dyes
| 24. Is the proposed development for ERA 20 (out of stream) and;
— in aFMA; and
— notlowimpact; and 7 , rT /
— not for a residential complex in the area, or for specified works.
mney LJ yes
against the Wild’ Rivers ‘Code. and must comply |
withthe code.
Ifyou answered YES'to 24 the.application will |
“not be accepted. if you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply |
with the code. |
. Exempt ERAs in a designated urban
area
“If the development is proposed in a designated
urban area there may be no wild fiver
requirements. See Section 2 Q2.
‘Note; All applications tlat.can be accepted must '
be assessed against and must comply with.the
» Wild Rivers Code (other'than exempt-ERAs in a
designated urban area).
‘Documentation : | 25. Has documentation been included with the application describing how the applicant proposes to
you answered NO to,025,-your appcaton comply with the mandatory requirements, required outcomes, and/ or performance requireme
may be subject to.an information request and . i, i 7
processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code?
(1Nno Dives

 

 

21 The administering authority may be either the EPA, or if devolved or delegated, the iocal government, DPIF or NRW.
Page 14

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published].pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.