Council archive · source document
Negotiated Decision Notice - 010.2009.00000945.001 [As Published] · 142009.945
Officer: Ron Read
Direct Telephone: (07) 5449 5263
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2009/945
Your Reference: 01134 L06 NG
22 October 2009
Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567
Dear Ms Gorton
Negotiated Decision Notice
Integrated Planning Act 1997
I refer to your application and the representations you made in respect to the Decision Notice. On
20 October 2009 Council decided your representations.
Details of the negotiated decision are as follows:
1 APPLICATION DETAILS
Application No: 2009/945
Street address: 75 Ben Lexcen Drive SUNSHINE BEACH
Real property description: LOT: 1 RP: 198277
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 10 September 2009 decided to issue the following type of approval:-
Development Permit for Operational Works - Minor Earthworks, Cricket Nets / Netball Court
In relation to representations dated 12 October 2009, Council decided to:
A. Agree to delete Condition 2.
B. Agree to include the additional plans to the list of approved plans.
C. Issue a Negotiated Decision Notice.
3 RELEVANT PERIOD OF APPROVAL
This Development Permit lapses if the Development has not happened by 20 October 2011 (two
years from Council’s original decision) unless application to extend the relevant period is approved
by Council.
4 ASSESSMENT MANAGER CONDITIONS
1. The development shall be carried out in accordance with the approved plans listed below or as
modified herein.
2. Deleted.
1 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
2009/945
3. Access to proposed netball courts:
a. The existing bikeway/footpath in Bicentennial Drive must remain open and clear of any
obstructions.
b. All sediment control devices shall be located within the school property.
4. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and
shall be flexible in that it addresses all stages of the development:
4.1. The nominated accesses location to and from the site.
4.2. The plan should detail the routing of trucks to and from the site.
4.3. Delivery vehicles and trucks to the site should only operate outside the peak school
drop off and pick up times namely 8.00am to9.00am and 2.30pm to 3.30pm.
4.4. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets, especially at the school peak times.
4.5. Provision of safe cycle and pedestrian movements in the vicinity of the development on
Bicentennial Drive and the Bicentennial Hall car park area.
4.6. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
4.7. Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
Control Devices and Transport Infrastructure (Roads) Act.
4.8. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
5. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
6. A site control and/or compliance bond of $3000 Officer to determine amount specific to
application is to be submitted to Council prior to the pre-start meeting. The pre-start meeting
will only be held once Council's Construction Technical Officer has confirmation that the bond
monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
7. Council’s Construction Engineering Officer (ph 0410 512 537), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
8. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
2 of 7
Page 3
2009/945
9. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
10. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff.
11. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
12. Council standards shall apply to these works unless otherwise modified herein.
13. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
Chief Executive Officer, Sunshine Coast Regional Council.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request the Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
14. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
15. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
16. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
17. Safe pedestrian access on Bicentennial Drive and Bicentennial Hall Car Park in the vicinity
of the development shall be maintained at all times. Should footpath / road closures be
necessary to carry out construction works, Council’s Construction Engineering Officer (ph
0410 512 537) must be notified prior to the proposed closure.
18. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved, it is the site's supervising engineer who is responsible for
ensuring that the sediment and erosion control measures have been designed by an RPEQ or
CPESC and constructed:
18.1. In accordance with "best practise" methods,
18.2. Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
18.3. Revised to address predicted rainfall events, and
18.4. Achieve the desired environmental outcomes.
3 of 7
Page 4
2009/945
Council’s Chief Executive Officer may request further controls to be installed should approved
measures be inefficient.
19. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
20. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
21. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5 REFERRAL AGENCY CONDITIONS
Not Applicable.
6 APPROVED PLANS
The approved plans for this development approval are listed in the following table:
Plan No. Re Plan Name Date
v.
09541 C2 D Earthworks & Erosion Control Details by Tod Consulting 25 August 2009
09541 C2 B Cricket Practice Net Plan by Tod Consulting 15 June 2009
WD-S-01 B Overall Site Plan by Middap Ditchfield Mar 09
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” (Form 2Development
Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
4 of 7
Page 5
2009/945
8 PROPERTY NOTES
Not Applicable.
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Not Applicable.
11 SELF ASSESSABLE CODES
Not Applicable.
12 SUBMISSIONS
Not Applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.
14 RIGHTS OF APPEAL
You have continuing appeal rights in respect of Council’s decision on your application. Refer Section
4.1.27. of the Integrated Planning Act 1997.
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Decision Notice History
10 September 2009 - Original Decision Notice.
20 October 2009 Negotiated Decision Notice with deletion of
Condition 2, deletion of one (1) plan and inclusion
of two (2) additional plans in Item 6.
Yours faithfully
Mark Lewis
Acting Coordinator Development Construction
5 of 7
Page 6
2009/945
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application may 4.1.29.(1) An advice agency may, within the limits of its
appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including any assessment; and
condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
submitter.
(2) An appeal under subsection (1)(a) to (d) must be
started within 20 business days (the “applicant’s appeal Appeals for matters arising after approval given
period”) after the day the decision notice or negotiated (co-respondents)
decision notice is given to the applicant.
4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be started at development application, a person to whom any of the
any time after the last day a decision on the matter should following notices have been given may appeal to the
have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for extension
4.1.28.(1) A submitter for a development application may of the relevant period for an approval;
appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including any minor change to an approval.
conditions (or lack of conditions) or other provisions (2) The appeal must be started within 20 business
of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the approval
days (the “submitters appeal period”) after the day the resulted from a development application (superseded
decision notice or negotiated decision notice is given to planning scheme) that was assessed as if it were an
the submitter. application under a superseded planning scheme.
(3) If a person withdraws a submission before the (4) Also, a person who has made a request
application is decided, the person may not appeal the mentioned in subsection (1) may appeal to the court
decision. against a deemed refusal of the request.
(4) If an application involves both impact assessment (5) An appeal under subsection (4) may be started at
and code assessment, appeal rights for submitters are any time after the last day the decision on the matter
available only for the part of the application involving should have been made.
impact assessment.
Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that
would have required public notification under the 4.1.31.(1) A person to whom any of the following notices
repealed Act. have been given may appeal to the court against the
decision in the notice-
(a) a notice giving a decision on a request to change or
1 cancel a condition of a development approval.
Section 3.1.6 (Preliminary approval may override local
planning instrument)
6 of 7
Page 7
2009/945
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the (a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
charges schedule or regulated State infrastructure
Division 3 – Appeals to tribunals relating to
charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or cancelled
by assessment manager or concurrence agency in certain
circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
7 of 7
Used in these records
Negotiated Decision Notice - 010.2009.00000945.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.