3.   Access to proposed netball courts:
     a.     The existing bikeway/footpath in Bicentennial Drive must remain open and clear of any
            obstructions.
     b.     All sediment control devices shall be located within the school property.
4.   A Traffic Management Plan (TMP) for the development addressing all construction phases
     shall be prepared by suitably qualified persons and submitted to Council for approval prior to
     the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and
     shall be flexible in that it addresses all stages of the development:
     4.1.   The nominated accesses location to and from the site.
     4.2.   The plan should detail the routing of trucks to and from the site.
     4.3.   Delivery vehicles and trucks to the site should only operate outside the peak school
            drop off and pick up times namely 8.00am to9.00am and 2.30pm to 3.30pm.
     4.4.   Provision of onsite parking for personnel working on this development, as there is
            limited parking available in adjacent streets, especially at the school peak times.
     4.5.   Provision of safe cycle and pedestrian movements in the vicinity of the development on
            Bicentennial Drive and the Bicentennial Hall car park area.
     4.6.   No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
            Further parked trucks must have engines turned off.
     4.7.   Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
            Control Devices and Transport Infrastructure (Roads) Act.
     4.8.   Provide an indication where the surplus spoil is to be transported to, and/or source of
            imported fill material.
5.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
     installed into the first existing external downstream stormwater structure.
     These devices are to be checked and cleaned on a regular basis and specifically after each
     rain event.
     These devices are to remain in place during the civil works and construction phases of the
     development.
     The location and type of device to be installed shall be established at the “pre start” meeting
     with Council’s Construction Technical Officer and shall be installed prior to the
     commencement of any works.
6.   A site control and/or compliance bond of $3000 Officer to determine amount specific to
     application is to be submitted to Council prior to the pre-start meeting. The pre-start meeting
     will only be held once Council's Construction Technical Officer has confirmation that the bond
     monies have been received by Council.
     The bond will be refunded less any costs incurred by Council in ensuring compliance with
     these conditions or any additional inspections incurred for substandard work or work
     undertaken not in accordance with this permit.
7.   Council’s Construction Engineering Officer (ph 0410 512 537), shall be given seven (7) days’
     notice of intention to commence works to arrange a “pre start” meeting prior to the
     commencement of works.
8.   The principal contractor must have all the appropriate insurance and public liability
     documentation to carry out the works. The principal contractor is also responsible to ensure
     that any sub contractors also have the appropriate insurance and public liability
     documentation.

                                                                                          2 of 7

Used in these records

About this file

File size
57 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - 010.2009.00000945.001 [As Published].pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.