MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 125, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
Specific Outcome Probable Solution Response
Steep slopes and Landslide hazard areas
O7 Detached houses and associated uses are S7.1 If on premises identified as a Landslide Hazard Area on R7 Not Applicable
sited or constructed to maintain the safety of Overlay Maps OM1.3–9.3 or on steep slopes, the use does
people and property from the risk of landslide. not— The proposed development does not involve a detached house.
a) involve the removal of vegetation other than grass from
use areas;
b) involve excavating or filling of more than 50m3 of material
(other than placement of topsoil not exceeding 100mm in
depth relative to natural ground level;
c) involve cut or fill with a vertical depth of more than 2m
relative to natural ground level;
d) redirect or impede water flows in an existing watercourse
or stormwater drain; or
e) involve construction of an on-site effluent disposal system;
OR
S7.2 A site specific geo-technical report prepared by a registered
professional engineer either—
a) certifies that the site is not at risk from landslide emanating
from the site or from other land; or
b) identifies methods of stabilising all buildings, accessways
and use areas;
AND
S7.3 If the geo-technical report identifies methods of stabilising
buildings, accessways and use areas, those methods are
implemented.
Gas Pipeline
O8 Adequate separation is provided between the S8.1 No new buildings for the purpose of Residential Uses (except R8 Not Applicable
new building works and the gas pipeline for a Detached house or class 10 building), Education uses,
shown on Overlay Maps OM3.5 or OM5.5; Wellbeing uses or Retail business uses are within 200m of The proposed development is not located within the vicinity of a gas
the gas pipeline shown on Overlay Maps OM3.5 or OM5.5; pipeline.
AND
S8.2 Any building works for the purpose of storage of flammable,
explosive or other hazardous materials are not within 200m
of the gas pipeline shown on Overlay Maps OM3.5 or OM5.5.
O9 Building works are constructed and operated S9.1 No solution provided (no requirement for self-assessable R9 Not Applicable
to avoid damaging or adversely affecting the development).
operation of the pipeline and the supply of The proposed development is not located within the vicinity of a gas
gas. pipeline.
14.96 Built form
Height
December 2014 Cardno HRP A44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.