Original source · versioned page text
MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 171, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
A13 – Transport, Roads and Drainage Code
The below code response has been prepared by Cardno HRP, Cardno Traffic and Transport and Cardno Engineering. In addition to the Town Planning Report,
reference should be made to the Traffic Impact Assessment Report (Appendix D) and the Engineering Report (Appendix E) in reading this code response.
Table 14-58 – Strategic transport network
Specific Outcome Probable Solution Response
14.145 Strategic Transport Network
O1 Traffic generation from the development is S1.1 Where the development leads to the need to increase R1.1 Will Comply
considered in a localised and a Shire wide transport infrastructure in the Shire, the development Infrastructure charges may be levied on any development approval
context to ensure that— contributes to the transport network in accordance with the issued by Noosa Shire Council.
a) the transport network has the capacity to requirements of the applicable infrastructure charging
safely and efficiently accommodate instrument and the Priority Infrastructure Plan in Part 15; and
projected movements; and/or where developments requires infrastructure not included in
the priority infrastructure plan, the development upgrades the
b) the development includes measures to infrastructure at no cost to Council.
upgrade the transport network to meet the
imposed demands.
O2 The street network has high street S2.1 Road planning and development design facilitates as many R2.1 Complies
connectivity, both within the development pedestrian and cycle movements as possible and provides for The proposed development includes pedestrian and bicycle
and to the surrounding local area. future connectivity and integration with adjoining sites; pathways which connect to the existing network within the site with
AND opportunities for connections beyond the site.
Refer to Appendix D – Traffic Impact Assessment.
S2.2 Arterial and sub-arterial roads are designed so they can R2.2 Not Applicable
operate with high volumes of traffic during peak times; The proposed road layout conforms to industry standard road
AND hierarchy function including acceptable facilities for private car,
public transport, cyclists and pedestrians.
Refer to Appendix D – Traffic Impact Assessment.
S2.3 Collector and local streets are provided to support short trips R2.3 Not Applicable
for local traffic moving in and between neighbourhoods. Local The road layout is informed by the specific provisions applying to the
traffic is channelled towards collector streets to ensure that SBC.
traffic volumes on local street are kept low;
AND
S2.4 Collector and local streets are designed to discourage R2.4 Not Applicable
through traffic; The road layout is informed by the specific provisions applying to the
AND SBC.
S2.5 A collector street is provided parallel to arterials particularly R2.5 Not Applicable
where they pass through town centres; The road layout is informed by the specific provisions applying to the
AND SBC.
December 2014 Cardno HRP A90
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.