                                                                                                                                                                                    Town Planning Report
                                                                                                     28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive



 Specific Outcome                                           Probable Solution                                                         Response
         a) minimise disturbance to native vegetation      S10.2    Roads avoid native vegetation and provide for fauna               R10.2 Will Comply
         and/or other habitat areas;                                underpasses and associated fencing where appropriate;             Refer to Appendix E – Engineering Report.
         b) protect and maintain wildlife corridor                  AND
         movements and the safety of native fauna;
         c) minimise changes to the hydrological           S10.3    Road infrastructure within or adjacent to native habitat          R10.3 Will Comply
         regime, including drainage patterns, run-off               incorporates fences which allow for protected wildlife            Refer to Appendix E – Engineering Report.
         and water quality;                                         movement and controls unrestricted access of domestic cats
                                                                    and dogs;
         d) avoid crossing watercourses, drainage
         lines and wetlands, but where such                         AND
         crossings are unavoidable, disturbed areas        S10.4    Native vegetation is protected from clearing or construction      R10.4 Will Comply
         are reinstated and revegetated on                          activities by—
         completion of works; and                                                                                                     Refer to Appendix E – Engineering Report.
                                                                    a) clearly marking vegetation to be retained with flagging tap;
         e) minimise bulk earthworks.
                                                                    b) installing protective fencing around the drip line of
                                                                    vegetation; and
                                                                    c) ensuring stock piling, storage and vehicle parking occur
                                                                    outside the areas of vegetation to be retained;
                                                                    AND
                                                           S10.5    Low impact construction techniques are used around areas of       R10.5 Will Comply
                                                                    vegetation to be retained to minimise interference with the       Refer to Appendix E – Engineering Report.
                                                                    vegetation.
 O11     Roads and stormwater drainage                              No solution provided.                                             R11 Alternative Solution (as no Probable Solution is available)
         infrastructure is proven to be suitable for its                                                                              A maintenance period will be provided.
         use prior to Council accepting the dedicated
         asset.                                                                                                                       Refer to Appendix E – Engineering Report.

 O12     Alignment of stormwater drainage                  S12.1    The location, design and construction of stormwater drainage      R12.1 Will Comply
         infrastructure is to allow for easy access for             structures is in accordance with Sections 4 and 5 of PSP5,        Refer to Appendix E – Engineering Report.
         the ongoing maintenance by Council.                        Engineering Design Standards - Roads, Drainage and
                                                                    Earthworks;
                                                                    AND
                                                           S12.2    Where infrastructure is located on private land an easement       R12.2 Will Comply
                                                                    is dedicated over the infrastructure in accordance with           Refer to Appendix E – Engineering Report.
                                                                    Section 4 of PSP 5, Engineering Design Standards – Roads,
                                                                    Drainage and Earthworks.
 14.148 Frontage works
 O13     Development is provided with external             S13.1    The following infrastructure components already exist at the      R13.1 Complies
         roadworks along the full extent of the                     frontage of the site or are provided at the developer’s           The frontage of the subject site is presently provided with all
         frontage of the site to an appropriate                     expense—                                                          necessary infrastructure.
         standard having regard to the specified                    a) full width sealed road;
         function of the road.
                                                                    b) concrete kerb and channel where appropriate;
                                                                    c) forming and grading to footpaths;



December 2014                                                                               Cardno HRP                                                                                             A97
Log in to download the original file

MCU14_0106 & OPW15_0001 Town Planning Report & Appendix A Code Compliance.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.