MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 178, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
Specific Outcome Probable Solution Response
a) minimise disturbance to native vegetation S10.2 Roads avoid native vegetation and provide for fauna R10.2 Will Comply
and/or other habitat areas; underpasses and associated fencing where appropriate; Refer to Appendix E – Engineering Report.
b) protect and maintain wildlife corridor AND
movements and the safety of native fauna;
c) minimise changes to the hydrological S10.3 Road infrastructure within or adjacent to native habitat R10.3 Will Comply
regime, including drainage patterns, run-off incorporates fences which allow for protected wildlife Refer to Appendix E – Engineering Report.
and water quality; movement and controls unrestricted access of domestic cats
and dogs;
d) avoid crossing watercourses, drainage
lines and wetlands, but where such AND
crossings are unavoidable, disturbed areas S10.4 Native vegetation is protected from clearing or construction R10.4 Will Comply
are reinstated and revegetated on activities by—
completion of works; and Refer to Appendix E – Engineering Report.
a) clearly marking vegetation to be retained with flagging tap;
e) minimise bulk earthworks.
b) installing protective fencing around the drip line of
vegetation; and
c) ensuring stock piling, storage and vehicle parking occur
outside the areas of vegetation to be retained;
AND
S10.5 Low impact construction techniques are used around areas of R10.5 Will Comply
vegetation to be retained to minimise interference with the Refer to Appendix E – Engineering Report.
vegetation.
O11 Roads and stormwater drainage No solution provided. R11 Alternative Solution (as no Probable Solution is available)
infrastructure is proven to be suitable for its A maintenance period will be provided.
use prior to Council accepting the dedicated
asset. Refer to Appendix E – Engineering Report.
O12 Alignment of stormwater drainage S12.1 The location, design and construction of stormwater drainage R12.1 Will Comply
infrastructure is to allow for easy access for structures is in accordance with Sections 4 and 5 of PSP5, Refer to Appendix E – Engineering Report.
the ongoing maintenance by Council. Engineering Design Standards - Roads, Drainage and
Earthworks;
AND
S12.2 Where infrastructure is located on private land an easement R12.2 Will Comply
is dedicated over the infrastructure in accordance with Refer to Appendix E – Engineering Report.
Section 4 of PSP 5, Engineering Design Standards – Roads,
Drainage and Earthworks.
14.148 Frontage works
O13 Development is provided with external S13.1 The following infrastructure components already exist at the R13.1 Complies
roadworks along the full extent of the frontage of the site or are provided at the developer’s The frontage of the subject site is presently provided with all
frontage of the site to an appropriate expense— necessary infrastructure.
standard having regard to the specified a) full width sealed road;
function of the road.
b) concrete kerb and channel where appropriate;
c) forming and grading to footpaths;
December 2014 Cardno HRP A97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.