MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance

of 239

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 177, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                 Town Planning Report
                                                                                                  28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive



 Specific Outcome                                          Probable Solution                                                       Response
         d) verges and footpaths provide—
             i. safe access for pedestrians and
             cyclists clear of obstructions;
             ii. an access area for vehicles onto
             properties;
             iii. a corridor allocated for services and
             utilities; and
             iv. additional amenity for minor roads.
 O8      Stormwater drainage infrastructure is            S8.1     Stormwater drainage planning, design and construction is in     R8.1 Will Comply
         planned, designed and constructed to—                     accordance with Section 4 of PSP5 Engineering Design            Detailed design and construction will be carried out as per the
         a) be accessible, cost effective and easily               Standards – Roads, Drainage and Earthworks;                     specified standards and guidelines.
         maintainable;                                             AND                                                             Refer to Appendix E – Engineering Report.
         b) protect downstream capacity;
                                                          S8.2     As Constructed data is submitted in accordance with Section     R8.2 Will Comply
         c) protect downstream water quality;                      6 of PSP5 Engineering Design Standards – Roads, Drainage        Detailed design and construction will be carried out as per the
         d) maximise on-site stormwater retention                  and Earthworks;                                                 specified standards and guidelines.
         and retardation; and                                      AND                                                             Refer to Appendix E – Engineering Report.
         e) convey run-off to stormwater drainage in
         a manner that allows roads to be trafficable     S8.3     Stormwater drainage planning, design and construction is in     R8.3 Will Comply
         in Q100 ARI local rainfall events.                        accordance with the Queensland Urban Drainage Design            Detailed design and construction will be carried out as per the
                                                                   Manual.                                                         specified standards and guidelines.
                                                                                                                                   Refer to Appendix E – Engineering Report.
 O9      Roads and stormwater drainage                    S9.1     Roads and stormwater drainage infrastructure is constructed     R9.1 Will Comply
         infrastructure is constructed—                            in accordance with—                                             Construction will be carried out as per the specified standards and
         a) in accordance with appropriate                         a) Sections 2, 3 and 4 of PSP5 Engineering Design               guidelines.
         engineering standards; and                                Standards – Roads, Drainage and Earthworks;                     Refer to Appendix E – Engineering Report.
         b) to minimise adverse environmental                      b) Queensland Design Code for Residential Streets;
         impacts, including from run-off and erosion.              c) AUSTROADS; or
                                                                   d) A combination of the principles in these documents;
                                                                   AND
                                                          S9.2     Erosion and sediment control measures are designed and          R9.2 Complies
                                                                   implemented in accordance with the Institution of Engineers     A Construction Environmental Management Plan and Erosion and
                                                                   Australia (Queensland Division) Soil Erosion and Sediment       Sediment Control Plan have been prepared.
                                                                   Control - Guidelines for Queensland Construction Sites.
                                                                                                                                   Refer to Appendix E – Engineering Report.
 Environmental Protection
 O10     Roads and stormwater drainage                    S10.1    Roads and stormwater drainage follow the edge of existing       R10.1 Will Comply
         infrastructure are located and aligned so as              disturbed areas, or alternatively, these works are co-located   Refer to Appendix E – Engineering Report.
         to—                                                       within a combined utility corridor;
                                                                   AND




December 2014                                                                            Cardno HRP                                                                                           A96
Log in to download the original file

MCU14_0106 & OPW15_0001 Town Planning Report & Appendix A Code Compliance.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.