MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 190, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
Performance Outcomes Acceptable Outcomes Response
AO2.3 Development within a coastal hazard area is located, designed and R2.3 Not Applicable
constructed to ensure exposed structures can sustain flooding from a
defined storm tide event.
AND
AO2.4 Essential community service infrastructure is: R2.4 Not Applicable
(1) located so that it is not inundated by a recommended storm tide event Not essential community service infrastructure.
specified for that infrastructure, or
(2) located and designed to ensure any components of the infrastructure
that are likely to fail to function or may result in contamination when
inundated by a storm tide (for example, electrical switch gear and
motors, water supply pipeline air valves) are:
(a) located above the peak water level for a recommended storm
tide event, or
(b) designed and constructed to exclude storm tide intrusions or
infiltration (including by being located in the ground), or
(c) able to temporarily stop functioning during a recommended
storm tide event without causing significant adverse impacts to
the infrastructure or the community.
AND
AO2.5 Emergency services infrastructure and emergency shelters, police R2.5 Not Applicable
facilities, and hospitals and associated facilities have an emergency rescue
area above the peak water level for a recommended storm tide event.
PO3 Development directly, indirectly and cumulatively AO3.1 Development avoids increasing the number of premises from which R3.1 Complies
avoids an unacceptable increase in the severity of the people would need to be evacuated to prevent death or injury from a The development is outside the influence of storm tide
coastal hazard, and does not significantly increase the defined storm tide event.
potential for damage on the premises or to other
premises.
PO4 Development avoids the release of hazardous AO4.1 Development that involves the manufacture or storage of R4.1 Not Applicable
materials as a result of a natural hazard event. hazardous materials in bulk are designed to: No hazardous material proposed to be manufactured or stored on
Editor’s note: Applications should: (1) prevent the intrusion of waters from a defined storm tide event into site
(1) assess the risk of storm tide inundation releasing structures or facilities containing the hazardous materials, or
or otherwise exposing hazardous materials, (2) ensure hazardous materials remain secured despite inundation,
including appropriate emergency planning and including secure from the effects of hydrodynamic forcing associated
contingency measures. with wave action or flowing water.
(2) applications are to be supported by a report
certified by a Registered Professional Engineer
of Queensland (RPEQ) that demonstrates this
performance outcome will be achieved.
AO5.1 Development in an erosion prone area within the coastal R5 Not Applicable
management district:
December 2014 Cardno HRP A109
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.