                                                                                                                                                                                   Town Planning Report
                                                                                                    28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive



A17 – Module 10.1 Tidal Works, or Development in a Coastal Management District State Code
The below code response has been prepared by Cardno HRP and Cardno Engineering. In addition to the Town Planning Report, reference should be made to the
Engineering Report (Appendix E) in reading this code response.
Table 10.1.1: All development
 Performance Outcomes                                   Acceptable Outcomes                                                            Response
 PO1 Development in a coastal hazard area is            AO1.1 Development is located outside a high coastal hazard area unless it      R1.1 Complies
 compatible with the level of severity of the coastal   is:                                                                            The development is located outside a high coastal hazard area
 hazard.                                                (1)   coastal-dependent development, or
                                                        (2)   compatible with inundation due to its nature or function, or
                                                        (3)   temporary, readily relocatable, or able to be abandoned, or
                                                        (4)   essential community service infrastructure, or
                                                        (5)   small - to medium-scale tourist development, or
                                                        (6)   redevelopment within an existing built-up urban area, or is
                                                              redevelopment of built structures that cannot be relocated or
                                                              abandoned.
                                                        AND
                                                        AO1.2 Development referred to in AO1.1(6) avoids being located within a        R1.2 Not Applicable
                                                        high coastal hazard area, or where this is not practicable, minimises the
                                                        exposure of people and permanent structures to coastal hazard impacts.
 PO2 Development siting, layout and access in a         AO2.1 Development within a coastal hazard area is located, designed,           R2.1 Complies
 coastal hazard area responds to potential inundation   constructed and operated to maintain or enhance the community’s                The development is outside the influence of storm tide.
 due to a defined storm tide event and minimises        resilience to defined storm tide events by limiting the exposure of people
 associated risks to personal safety and property.      and structures to associated impacts.
                                                        AND
                                                        AO2.2 Development mitigates any residual impacts from storm tide               R2.2 Not Applicable
                                                        inundation in a coastal hazard area including by ensuring:
                                                        (1) habitable rooms of built structures are located above the defined
                                                              storm tide event level and any additional freeboard level that would
                                                              ordinarily apply in a flood prone area under a relevant planning
                                                              scheme standard, or
                                                        (2) a safe refuge is available for people within the premises during a
                                                              defined storm tide event, or
                                                        (3) at least one evacuation route remains passable for emergency
                                                              evacuations during a defined storm tide event, including consideration
                                                              of the capacity of the route to support the evacuation of the entire
                                                              local population within a reasonably short timeframe (for example, 12
                                                              hours).
                                                        AND




December 2014                                                                                Cardno HRP                                                                                          A108
Log in to download the original file

MCU14_0106 & OPW15_0001 Town Planning Report & Appendix A Code Compliance.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.