Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
A17 – Module 10.1 Tidal Works, or Development in a Coastal Management District State Code
The below code response has been prepared by Cardno HRP and Cardno Engineering. In addition to the Town Planning Report, reference should be made to the
Engineering Report (Appendix E) in reading this code response.
Table 10.1.1: All development
Performance Outcomes Acceptable Outcomes Response
PO1 Development in a coastal hazard area is AO1.1 Development is located outside a high coastal hazard area unless it R1.1 Complies
compatible with the level of severity of the coastal is: The development is located outside a high coastal hazard area
hazard. (1) coastal-dependent development, or
(2) compatible with inundation due to its nature or function, or
(3) temporary, readily relocatable, or able to be abandoned, or
(4) essential community service infrastructure, or
(5) small - to medium-scale tourist development, or
(6) redevelopment within an existing built-up urban area, or is
redevelopment of built structures that cannot be relocated or
abandoned.
AND
AO1.2 Development referred to in AO1.1(6) avoids being located within a R1.2 Not Applicable
high coastal hazard area, or where this is not practicable, minimises the
exposure of people and permanent structures to coastal hazard impacts.
PO2 Development siting, layout and access in a AO2.1 Development within a coastal hazard area is located, designed, R2.1 Complies
coastal hazard area responds to potential inundation constructed and operated to maintain or enhance the community’s The development is outside the influence of storm tide.
due to a defined storm tide event and minimises resilience to defined storm tide events by limiting the exposure of people
associated risks to personal safety and property. and structures to associated impacts.
AND
AO2.2 Development mitigates any residual impacts from storm tide R2.2 Not Applicable
inundation in a coastal hazard area including by ensuring:
(1) habitable rooms of built structures are located above the defined
storm tide event level and any additional freeboard level that would
ordinarily apply in a flood prone area under a relevant planning
scheme standard, or
(2) a safe refuge is available for people within the premises during a
defined storm tide event, or
(3) at least one evacuation route remains passable for emergency
evacuations during a defined storm tide event, including consideration
of the capacity of the route to support the evacuation of the entire
local population within a reasonably short timeframe (for example, 12
hours).
AND
December 2014 Cardno HRP A108
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.