MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 198, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
Table 10.1.2: Operational work
Performance Outcomes Acceptable Outcomes Response
PO1 Tidal works that is private marine development AO1.1 The location and design of tidal works that is private marine R1 Not Applicable
does not result in adverse impacts to tidal land. development: The proposed development does not involve private marine
Editor’s note: In addressing this performance (1) is on private land abutting tidal water and used for property access development.
outcome, the applicant should also have regard to purposes
requirements for private marine development in the
prescribed tidal works code in the Coastal Protection
(2) occupies the minimum area reasonably required for its designed
purpose
and Management Regulation 2003.
Editor’s note: Applications should be supported by a (3) is not to be roofed or otherwise covered
report certified by an RPEQ to demonstrate (4) does not require the construction of coastal protection works,
compliance with this performance outcome. shoreline or riverbank hardening or dredging for marine access
(5) does not adversely impact on public safety or public access and use
of the foreshore.
PO2 Development does not result in the disposal of No acceptable outcome is prescribed. R2 Not Applicable
material dredged from an artificial waterway into
coastal waters, with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing artificial waterway
and the at-sea disposal of material that has
previously been approved for the waterway.
PO3 The design and construction of an artificial AO3.1 The design and construction of the artificial waterway provides for R3 Not Applicable
waterway maintains coastal landforms. sand bypassing where this is necessary to prevent erosion of adjacent The proposed development does not artificial waterways.
coasts and minimise sedimentation of the waterway.
AND
AO3.2 Clean sand accumulating within an artificial waterway is returned to
the active beach system, in preference to disposal on land.
PO4 Development that involves dredging includes and AO4.1 A management plan for the development: R4 Not Applicable
complies with a management plan that demonstrates (1) directs the operation of the development
how environmental impacts will be managed and
mitigated, and how the requirements of the National (2) identifies disposal methods and disposal sites for the removed
assessment guidelines for dredging, Australia material for the construction and operational phases of the
Government Department of the Environment, Water, development
Heritage and the Arts, 2009 will be met. (3) outlines how any adverse effects from extraction activities on
sediment transport processes or adjacent coastal landforms will be
mitigated or otherwise remediated by suitably planned and
implemented beach nourishment and rehabilitation works.
Editor’s note: The development should comply with the National
assessment guidelines for dredging, Australian Government Department of
Environment, Water, Heritage and the Arts, 2009.
AND
December 2014 Cardno HRP A117
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.