MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 209, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
A20 – Module 18.2 Stormwater and Drainage Impacts on State Transport Infrastructure State Code
The below code response has been prepared by Cardno HRP and Cardno Engineering. In addition to the Town Planning Report, reference should be made to the
Engineering Report (Appendix E) in reading this code response.
Performance Outcomes Acceptable Outcomes Response
Stormwater and drainage management
PO1 Stormwater management for the development AO1.1 The development does not result in stormwater or drainage impacts R1.1 Complies
must ensure there is no worsening of, and no or actionable nuisance within an existing or future state transport corridor. Stormwater detention is being provided to ensure pre development
actionable nuisance in relation to peak discharges, Editor’s note: It is recommended that basic stormwater information is to be peak flows up to and including the 1% AEP critical storm event are
flood levels, frequency or duration of flooding, flow prepared to demonstrate compliance with AO1.1. maintained.
velocities, water quality, ponding, sedimentation and
scour effects on an existing or future state transport OR
corridor for all flood and stormwater events that exist AO1.2 A stormwater management statement certified by an RPEQ R1.2 Not Applicable
prior to development, and up to a 1 per cent annual demonstrates that the development will achieve a no worsening impact or
exceedance probability. The proposed development complies with AO1.1
actionable nuisance on an existing or future state transport corridor.
OR
AO1.3 A stormwater management plan certified by an RPEQ R1.3 Not Applicable
demonstrates that the development will achieve a no worsening impact or The proposed development complies with AO1.1
actionable nuisance on a state-controlled road.
OR
AO1.4 For development on premises within 25 metres of a railway, a R1.4 Not Applicable
stormwater management plan certified by an RPEQ demonstrates that: The proposed development complies with AO1.1
(1) the development will achieve a no worsening impact or actionable
nuisance on the railway
(2) the development does not cause stormwater, roofwater, ponding,
floodwater or any other drainage to be directed to, increased or
concentrated on the railway
(3) the development does not impede any drainage, stormwater or
floodwater flows from the railway
(4) stormwater or floodwater flows have been designed to:
(a) maintain the structural integrity of the light rail transport
infrastructure
(b) avoid scour or deposition
(5) additional railway formation drainage necessitated by the
development is located within the premises where the development is
carried out
(6) retaining structures for excavations abutting the railway corridor
provide for drainage.
Lawful point of discharge
December 2014 Cardno HRP A128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.