Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Callaghan & Toth
The mean Annual Rainfall for Cooroy 92 – 02 = 1585mm
The mean Annual Rainfall for Cooroy 72 – 02 = 1650mm
The MUSIC Modelling Guidelines (2010) details that Cooroy data for 1973 to 1983 should be
used. This data has an annual average Rainfall of 1600mm. It is considered that the 10 year
period from 1992 – 2002 has a relatively close mean annual Rainfall to the recommended 10
year period and as such is acceptable to use in this case.
Urban Residential rainfall-runoff parameters from the draft guidelines have been used.
4.3 MUSIC Modelling Results
The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC Version 6.0.1 is the current version and was
used to assess this development proposal.
4.3.1 Water Quality Objectives
This proposed stormwater treatment system for the development, when modelled using MUSIC
meets the pollution load reduction target as detailed in DSDIP’s State Planning Policy
December 2013 – Appendix 2, Table B. The following have been included in Appendix 2.
The treatment train effectiveness for the system.
The MUSIC Version 6.0.3 Summary Report.
The treatment train effectiveness for the system is shown below in Table 4.2. The results
indicate that the proposed stormwater treatment train will be effective in achieving the
reductions as outlined in the State Planning Policy December 2013 – Appendix 2, Table B. It
reduces sediment and nutrient concentrations and loads to an acceptable level and also
reduces runoff concentrations.
TABLE 4.2: COMPARISON OF LOAD REDUCTIONS
MUSIC REDUCTION POLLUTANT LOAD
PARAMETERS
RESULTS REDUCTION TARGETS
Flow 3%
Total Suspended Solids 81% 80%
Total Phosphorous 58% 60%
Total Nitrogen 51% 45%
Gross Pollutants 99% 90%
4.3.2 Assessment of Results
The developed site has been modelled as a series of Urban Residential sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD) treatment trains. Figure 3.1 and Figure 3.2
show the proposed locations of the treatment systems. The reductions listed in Table 4.2 above
generally comply with Council’s requirements, Water by Design Deemed to Comply Solutions
and the State Planning Policy December 2013 – Appendix 2, Table B. Therefore, it is
considered that the proposed stormwater treatment system is currently sufficient to reduce the
pollutants prior to exiting the site and entering the tributary of the Six Mile Creek.
55 Lake MacDonald Drive – Stage 1 to 5 pg. 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.