Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                         Callaghan & Toth

TABLE 4.3: Design Features of Stormwater Treatment Systems

                                                                                                             Extended
                       Filter         Overall    Length   Width        Total     Filter Depth   Transition
  SYSTEM                                                                                                     Detention
                     S.A. (m2)       S.A. (m2)     (m)     (m)       Depth (m)        (m)       Layers (m)
                                                                                                             Depth (m)
 Bio Basin 1             25              47       6.25       4          0.8          0.5           0.3          0.3
 Bio Basin 2             211             275                            0.8          0.5           0.3          0.3
 Bio Basin 3             150             202                            0.8          0.5           0.3          0.3
  Road Bio
                         10              10        4        2.5        0.65          0.4           0.25         0.1
  Basin 1a
  Road Bio
                         15              15        6        2.5        0.65          0.4           0.25         0.1
  Basin 1b
  Road Bio
                         10              10        4        2.5        0.65          0.4           0.25         0.1
   Basin 2
 Bio Swale 1             97              97       80        1.2        0.65          0.4           0.25         0.0
 Bio Swale 2             82              82       70        1.2        0.65          0.4           0.25         0.0
Raingardens
  (a total of 4 on       24              24        3         2         0.55          0.4           0.25        0.15
        site)
   Grassed
                         n/a             150      40      2.5 to 5      n/a          n/a           n/a          n/a
    Buffer




55 Lake MacDonald Drive – Stage 1 to 5                                                                                        pg. 18
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.