Original source · versioned page text
Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Callaghan & Toth
5.3 Western Tributary
It is proposed to reshape the existing western tributary to achieve the following:
Increase flood storage for the site
Reduce maintenance requirements for the watercourse
Reduce habitat for pests species, that is remove breeding ponds for mosquitos and
toads
Improve drainage through the site
The proposed works include:
Reshaping the low flow profile between the top of banks on both sides of the
watercourse. Drawing Number 1225-33 shows the area of earthworks.
Placement of a 1.5m wide rock lined invert for the length of the watercourse
Revegetation of the banks to replace the weeds removed on site
Maintain existing trees within the riparian zone of the watercourse
55 Lake MacDonald Drive – Stage 1 to 5 pg. 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.